Problem

Cause

Solution

The maintenance wrench icon 

appears in the power meter display.

There is a problem with the 

inputs to the power meter.

See the Alert sub-menu or the Diagnostic Alert Modbus Register 

146

The display is blank after applying 

control power to the meter.

The meter is not receiving 

adequate power.

Verify that the meter control power are receiving the required 

voltage. 

Verify that the heart icon is blinking.
Check the fuse.

The data displayed is inaccurate.

Incorrect setup values

Verify the values entered for power meter setup parameters (CT 

and PT ratings, system type, etc.). See the Setup section.

Incorrect voltage inputs

Check power meter voltage input terminals to verify adequate 

voltage.

Power meter is wired 

improperly.

Check all CTs and PTs to verify correct connection to the same 

service, PT polarity, and adequate powering. See the Wiring 

Diagrams section for more information.

Cannot communicate with power 

meter from a remote personal 

computer.

Power meter address is incorrect. Verify that the meter is correctly addressed (see Setup section).
Power meter baud rate is 

incorrect.

Verify that the baud rate of the meter matches that of all other 

devices on its communications link (see Setup section).

Communications lines are 

improperly connected.

Verify the power meter communications connections (see the 

Communications section).

Verify the terminating resistors are properly installed on both ends 

of a chain of units. Units in the middle of a chain should not have 

a terminator.

Verify the shield ground is connected between all units.

Troubleshooting

China RoHS 
Compliance 
Information - 
Environment Friendly 
Use Period (EFUP) 
Table

本表格依据

SJ/T11364

规定编制。

O: 

表示

该有害物质在该部件所有均质材料中的含量均在

GB/T 26572

规定的限量要求以下。

X: 

表示

该有害物质至少在该部件的某一均质材料中的含量超出

GB/T 26572

规定的限量要求。

(企

业可在此处,根据实际情况对上表中打

的技

术原因进行进一步说明。)

This table is made according to SJ/T 11364.

O: indicates that the concentration of hazardous substance in all of the homogeneous materials for this part is below 

the limit as stipulated in GB/T 26572.

X: indicates that concentration of hazardous substance in at least one of the homogeneous materials used for this part 

X

O

O

O

O

O

is above the limit as stipulated in GB/T 26572

Z000057-0B

部件名称

Part Name

有害物

-

Hazardous Substances

(Pb)

(Hg)

(Cd)

六价

(Cr (VI))

多溴

联苯

(PBB)

多溴二苯

(PBDE)

电子件

Electronic

Summary of Contents for E50C1A

Page 1: ...nd if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications This device complies with part 15 of the FCC Rules Operation is subject to...

Page 2: ...529 IP40 front display IP20 meter Display Characteristics Back lit blue LCD Terminal Block Screw Torque 0 37 to 0 44 ft lb 0 5 to 0 6 N m Terminal Block Wire Size 24 to 14 AWG 0 2 to 2 1 mm2 Rail T35...

Page 3: ...Installation Guide Table of Contents Dimensions 4 Data Outputs 4 Product Diagram 5 Display Screen Diagram 5 Installation 6 Supported SystemTypes 7 Wiring Symbols 7 Wiring 8 Control Power 9 Quick Setu...

Page 4: ...VerisIndustries L L C intheUSAand orothercountries Othercompanies trademarksareherebyacknowledgedtobelongtotheirrespectiveowners TM E50C1A Installation Guide Dimensions 4 2 107mm 3 6 91mm 1 5 39mm 2 3...

Page 5: ...ndicator RS 485EquippedUnitsOnly TransmitData ReceiveData ReceiveDataError LCDScreen Buttons Up Select Right Next Down Select Left Back kWh 1234 5 Alarm Energy Two5 characterrows ofdisplaytext Toprowa...

Page 6: ...35 mm DIN rail or screw mounted to the interior surface of the enclosure A DINRailMounting 1 Attach the mounting clips to the underside of the housing by sliding them into the slots from the inside Th...

Page 7: ...r System Type will display as on the User Interface or as QNAN in the Modbus registers CTs Voltage Connections SystemType Phase Loss Measurements Wiring Diagram Number of wires Qty ID Qty ID Type Modb...

Page 8: ...TnoPT UseSystemType11 2L UseSystemType12 2L 1n UseSystemType 31 3L UseSystemType10 1L 1n Wiring RISK OF ELECTRIC SHOCK OR PERMANENT EQUIPMENT DAMAGE CT terminals are referenced to the meter s neutral...

Page 9: ...L L Outputto meetmeterinputrequirements DCControlPowerfrom125Vdcto300Vdc ULandCEmax FuseRecommendations Keep the fuses close to the power source obey local and national code requirements For selecting...

Page 10: ...ect the parameter screen you want to set 6 After you set the parameters you want use or to select the next Setup screen or to exit the Setup screens return to SETUP B ToEnterModbuscommunicationparamet...

Page 11: ...powered and no phase loss alarm conditions are present All pulse outputs and communication circuits are only intended to be connected to non hazardous circuits SELV or Class 2 Do not connect to hazar...

Page 12: ...KWh Accumulated Real Energy Ph SETUP ALERT RESET Back Display nOnE if no alerts To Setup Setup Meter Reset Data Phase Loss A B C Low Power Factor A B C Frequency Out of Range A Current Over Range Vol...

Page 13: ...00 SYSTM 3L 1n 3L 2L 1n 2L 1L 1n Back To SETUP Back Back Back S COM To Setup p 2 SPLOS Next S PT Set Potential Transfomer Ratio RATIO Potential transformer step down is RATIO 1 Default is 1 1 No PT in...

Page 14: ...the selection if it cannot find a pulse duration that will allow the pulse output to keep up with Theoretical Maximum System Power see S_PWR screen When moving up to a larger energy the meter will jum...

Page 15: ...47 k pull down to Shield RS 485 signal ground Wire the RS 485 bus as a daisy chain from device to device without any stubs Use 120 termination resistors at each end of the bus not included Shield is...

Page 16: ...status 0x00 if the reset system is used bytes5 ID string Veris Industries E50xx Power Meter Full Data Set or Veris Industries E50xx Power Meter RESET SYSTEM RUNNING RSVersion x xxx last 2 bytes CRC 0x...

Page 17: ...atio of 2 1 The default is 100 1 00 1 which is with no PT attached Set this value before setting the system voltage below 134 R W NV UInt 82 32000 SystemVoltage This voltage is line to line except for...

Page 18: ...nd a pulse duration that will keep up with the max system power register 135 it will reject the new value Try a larger value kWh Pulse Contacts Note The kWh pulse contact can keep up with a maximum po...

Page 19: ...nge Description 152 R W NV UInt 0 32767 Power Up Counter 153 R NV UInt 0 32767 Output Configuration E50C1 always returns 0 154 R UInt Reserved returns 0 Floating Point Data 257 258 R NV Float kWh Real...

Page 20: ...ct connection to the same service PT polarity and adequate powering See theWiring Diagrams section for more information Cannot communicate with power meter from a remote personal computer Power meter...

Reviews: