7.0 Maintenance
7.0
Maintenance
7.1
General Maintenance
Preventive rather than reactive maintenance is recommended. The type and frequency
depends on the product use; the following are recommended.
7.2
Maintenance Schedule
CUSTOMER
QUALIFIED PERSONNEL
DANGER! ELECTRIC SHOCK
. Risk of fatal injury. Only electrically
qualified personnel should attempt these maintenance procedures.
Maintenance
Procedure
Method
Frequency
Daily
Weekly
Monthly
Bi-
Annually
Annually
Safety
Safety Switch Function
Set a safe temperature above ambient, and
open the door to see if the heater light goes
out
Safety Switch Function
Electrical measurement
Over-Temperature Safety
Circuit
(if fitted)
Set an over-temperature setpoint lower than
the displayed temperature and check for an
over-temperature alarm as detailed in this
manual
Over-Temperature Safety
Circuit
(if fitted)
Electrical measurement
Door Plug
Visual inspection, checking the seal and
whether it is free of damage
Door Plug
Replacement where necessary
Chimney / Extraction
Check and clean if necessary
Electrical Safety
(external)
Visual check of external cables and plugs
Electrical Safety
(internal)
Physically check all connections and cleaning
of the power plate area
Function
Temperature Calibration
Tested using certified equipment, frequency
dependent on the standard required
48
Summary of Contents for CARBOLITE GERO HTF 17/10
Page 7: ...Caution Double Pole Neutral Fusing 7 1 0 Symbols and Warnings ...
Page 38: ...4 0 3508 Dual Loop Cascade Power Limit View 38 ...
Page 60: ...8 0 Repairs and Replacements 60 ...
Page 65: ...G Grey GR Y Green Yellow 65 10 0 Wiring Diagrams ...
Page 69: ...Notes Service Record Engineer Name Date Record of Work ...