![VERDER CARBOLITE GERO HTF 17/10 Installation, Operation And Maintenance Instructions Download Page 53](http://html.mh-extra.com/html/verder/carbolite-gero-htf-17-10/carbolite-gero-htf-17-10_installation-operation-and-maintenance-instructions_1003675053.webp)
8.0
Repairs and Replacements
8.1
Safety Warning - Disconnection from Power Supply
Immediately switch the product off in the event of unforeseen
circumstances (e.g. large amount of smoke). Allow the product to return
to room temperature before inspection.
Always ensure that the product is disconnected from the electrical supply
before repair work is carried out.
Caution
: Double pole/neutral fusing may be used in this product.
8.2
Safety Warning - Refractory Fibre Insulation
Insulation made from High Temperature Insulation Wool
Refractory Ceramic Fibre, better known as (Alumina silicate
wool - ASW).
This product contains
alumino silicate wool
products in its thermal insulation. These
materials may be in the form of blanket or felt, formed board or shapes, slab or loose
fill wool.
Typical use does not result in any significant level of airborne dust from these materials,
but much higher levels may be encountered during maintenance or repair.
Whilst there is no evidence of any long term health hazards, it is strongly recommended
that safety precautions are taken whenever the materials are handled.
Exposure to fibre dust may cause respiratory disease.
When handling the material, always use approved respiratory protection
equipment (RPE-eg. FFP3), eye protection, gloves and long sleeved clothing.
Avoid breaking up waste material. Dispose of waste in sealed containers.
After handling, rinse exposed skin with water before washing gently with
soap (not detergent). Wash work clothing separately.
Before commencing any major repairs it is recommended to make reference to the
European Association representing the High Temperature Insulation Wool industry
(www.ecfia.eu).
Further information can be provided on request. Alternatively, Carbolite Gero Service
can quote for any repairs to be carried out either on site or at the Carbolite Gero
factory.
8.3
Side Panel Removal
Except where explicitly stated, always disconnect the electrical supply
before removing the side panel.
53
8.0 Repairs and Replacements
Summary of Contents for CARBOLITE GERO HTF 17/10
Page 7: ...Caution Double Pole Neutral Fusing 7 1 0 Symbols and Warnings ...
Page 38: ...4 0 3508 Dual Loop Cascade Power Limit View 38 ...
Page 60: ...8 0 Repairs and Replacements 60 ...
Page 65: ...G Grey GR Y Green Yellow 65 10 0 Wiring Diagrams ...
Page 69: ...Notes Service Record Engineer Name Date Record of Work ...