6.
COMMISSIONING
6.1
Initial Start Up
Step 1 - Ion-exchange cylinders
1.
ENSURE that any
Ion-exchange
cylinders are
ISOLATED from the recirculation loop (if applicable).
Step 2 - Electrical supply
1.
The electrical supply to the
CENTRA
should be
installed correctly as described in Section 4.3,
Step 2.
2.
SWITCH on the power at the supply. The unit will
perform a processor initiation and the display will
illuminate. The initiation is complete when the
display shows three lines of text.
3.
CONFIRM that the display states the correct unit
type. If incorrect contact your local ELGA LabWater
representative.
Step 3 - Water supply
1.
The water supply to the
CENTRA
should be
installed correctly as described in Section 4.3,
Step 1.
2.
TURN on the feedwater supply to the unit.
WARNING! ENSURE THAT ALL PRE-TREATMENT
EQUIPMENT IS INSTALLED AND FLUSHED
TO DRAIN BEFORE COMMENCING CENTRA
COMMISSIONING.
FAILURE TO INSTALL SUFFICIENT PRE-
TREATMENT MAY RESULT
IN POOR
PERFORMANCE AND DAMAGE TO THE
CENTRA.
3.
Check all hydraulic connections are watertight and
there are no leaks.
CAUTION!
Failure to properly flush the installation may
result in debris from pipework being
deposited into the CENTRA that may
ultimately cause damage to pumps and
valves.
General view
CENTRA – MDS US
General view
CENTRA - LDS/RDS US