21
4
5
D
C
Fig.4:
The view of the brake housings from above, once the housings are routed through the stem.
Fig.5:
Install the stem top cap
C
(arrow pointing forward) and top cap bolt
D
, then adjust for proper headset
bearing preload.
Fig.5:
Align the stem with the fork, then torque the stem bolts to 45 in-lbf (5.1 Nm).
6
Fig.6:
Route the brake housings through the handlebar port and into the left and right handlebar, then position the
handlebar against the stem. Guide the Di2 wire exiting the stem through the handlebar port and out the front.
To make routing the housings easier, install an Internal Cable Routing guide wire in each side of
the handlebar and connect them to the brake housings to help pull the brake housings through the
handlebar.
FACTORY ROUTING (a):
4a
Fig.4a:
Plug the wire exiting the stem into the Junction B box, then place the box inside the handlebar. At this
point, all three wires are plugged into the box.
Fig.4a:
With the handlebar positioned against the stem, place the junction B box inside the handlebar.
Summary of Contents for VIAS
Page 1: ...USER MANUAL...
Page 2: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ...SPECIALIZED BICYCLE COMPONENTS 15130 Concord Circle Morgan Hill CA 95037 408 779 6229...