![VENCO VC-416 ES Installation & Owner'S Manual Download Page 7](http://html1.mh-extra.com/html/venco/vc-416-es/vc-416-es_installation-and-owners-manual_4023857007.webp)
6242
H200
10-24-94
7-6-98A
INST INSTRUCTIONS
VP/VC-6D
SUPERCEDES
TITLE
DATE
SECTION
5&6. Longitudinal Supports (optional) & Plastic Pads:
- See instructions on page 6244
7.
Hoist Mainframe:
The Hoist Mainframe is offset 2-1/2 inches toward the curb side (right side). Put 3/8"-16 x 3"
bolts with flat washer up through the inside of the chassis frame rails on each side of the
crossmember and up through the 2 inch square tube - 7/16" hole through each end of tube and
put 3/8" lock washer and hex nut on the top side of the tube. Use the 4 holes in the 1/4" thick
Base Plate as a guide to drill four 5/16" dia. holes through the front flange of the chassis
crossmember - see FIGURE 7D below.
8.
Hydraulics:
Power unit can be mounted under the hood at the auxiliary battery location - right side, but
longer hoses are required one 13 FT. and one 14 FT. Otherwise, mount Power Unit same as
specified in the instructions - See instructions on pages 6122, 6096, and 6133B.
9.
Electrical:
Connect the battery cable to the positive lead in the fuse box next to the battery under the hood.
10. Dash Control Switch: