138
106309-03 - 4/19
Altitude
Model
Fuel
Recommended CO
2
Range
Percentage Derate
(approx. per 1000 ft)
2,001 ft
to 4,500 ft
PHNTM399C
NG
8.6-9.2
2.3%
LP
9.4-10.2
PHNTM500C
NG
8.7-9.2
4.1%
LP
9.8-10.1
PHNTM600C
NG
8.6-9.2
0.0%
LP
9.4-9.9
PHNTM700C
NG
8.2-8.7
1.7%
LP
9.2-9.7
PHNTM800C
NG
8.2-9.1
1.2%
LP
9.4-10.0
0.0%
4,001 ft
to 6,000 ft
PHNTM399C
NG
8.6-9.2
2.3%
LP
9.4-10.2
PHNTM500C
NG
8.7-9.2
4.1%
LP
9.8-10.1
PHNTM600C
NG
8.6-9.2
0.0%
LP
9.4-9.9
PHNTM700C
NG
8.2-8.7
0.0%
LP
9.2-9.7
PHNTM800C
NG
8.2-9.1
1.2%
LP
9.4-10.0
0.0%
6,001 ft
to 7,800 ft
PHNTM399C
NG
8.6-9.2
2.2%
LP
9.4-10.0
PHNTM500C
NG
8.7-9.2
3.6%
LP
No Application
No Application
PHNTM600C
NG
8.6-9.2
0.7%
LP
9.4-9.7
1.2%
PHNTM700C
NG
8.2-8.7
0.8%
LP
9.2-9.5
PHNTM800C
NG
No Application
No Application
LP
9.4-9.8
1.4%
7,801 ft
to 10,100 ft
PHNTM399C
NG
8.6-9.2
2.2%
LP
9.4-9.8
PHNTM500C
NG
8.7-9.2
3.4%
LP
No Application
No Application
PHNTM600C
NG
8.6-9.2
2.0%
LP
9.4-9.8
PHNTM700C
NG
8.2-8.7
2.0%
LP
No Application
No Application
PHNTM800C
NG
No Application
No Application
LP
9.4-9.7
2.8%
NOTE
: De-rate’s per 1000 ft are approximate
**Based on minimum vent length**
Appendix A - Instructions for High Altitude Installations Above 2000 ft. and LP
Conversions
(continued)
Table S2: Phantom X Altitude Adjustments
Summary of Contents for Phantom-X Series
Page 49: ...49 106309 03 4 19 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only...
Page 63: ...63 106309 03 4 19 VIII Electrical continued Figure 40 Ladder Diagram...
Page 64: ...64 106309 03 4 19 VIII Electrical continued Figure 41 Wiring Connections Diagram 2...
Page 73: ...73 106309 03 4 19 IX System Start up continued Figure 47 Operating Instructions...
Page 124: ...124 106309 03 4 19 XIII Service Parts continued...
Page 130: ...130 106309 03 4 19 XIII Service Parts continued...
Page 133: ...133 106309 03 4 19 XIII Service Parts continued 10A 10B 10C 10D 10G...
Page 139: ...139 106309 03 4 19...