8.1 Maintenance and inspection table
Inspection and maintenance schedule
Interval
Part to be inspected
Work to be carried out
Remarks
Every day
Boiler
Blow-down (only for
standard version)
Ball valves
Leak test
Check and replace, if
necessary.
n
Pressure gauge
n
Pressure regulator
Function check
Check and replace, if
necessary.
Steam hoses
Check for damages
Replace defective steam
hoses.
Every 6 months
Steam valve
Leak test
Check and replace, if
necessary.
All hoses
Check for damages
Replace defective hoses.
Connection cable
Check for damages
Replace defective con-
nection cable.
Every year
All connections and com-
ponents
Leak test
Check and replace, if
necessary.
Corrosion on mounting
clamps
Check and replace, if
necessary.
Tightness
Check and replace, if
necessary.
All function parts:
n
Pressure gauge
n
Pressure regulator
n
Check valve
Function check
Check and replace, if
necessary.
n
Inside of boiler
n
Electrode
n
Heating elements
n
Check for contamina-
tion
n
Check for lime
deposits
n
Remove contamina-
tions.
n
Remove lime
deposits.
n
Filling assembly
n
Blow-down assembly
n
Check for contamina-
tion
n
Check for corrosion
n
Remove contamina-
tions.
n
Replace corroded
parts.
n
Filling nozzle
n
Blow-down nozzle
Check for lime residue
Check and clean, if nec-
essary.
CAUTION!
Safety devices
For checks of the safety devices, please refer to
Chapter 3.4 ‘Built-in safety devices’ on page 18
.
Maintenance and cleaning
Maintenance and inspection table
30.09.2022
Steam generator VEIT SG67
40