![background image](http://html1.mh-extra.com/html/vega-absolute/vega-nb-11/vega-nb-11_user-manual_3807528016.webp)
Vega NB-11 / User Manual
16
Revision 06 of 12 January 2022
5.
Connecting all necessary wires to the contacts.
6.
Connecting the battery at the connector. After the battery connection the device
loads and comes to sleep until the next communication session.
7.
If you need to test the data transmitting, then press and hold the INIT button for the
2 seconds.
8.
Before assembling the device, you can reset the pulses accumulated during testing
and connection through the “Vega NB-IoT Configurator” if it is necessary.
9.
Assembling the device.
Location of SIM-
holder on the
board (if there is)
Location of the
battery connector
on the board