o BIS limits for OOS/ISM
o Evaluation periods of 15 minutes, 2 hours and 24 hours
o First step is a continuity test for 15 minutes
o PDH paths are composed of sub-elements of different lengths each with its own set Reference Performance
Objectives (RPO)
-
M.2101 Analysis:
Performance limits and objectives for maintenance and bringing into service SONET paths and multiplex
sections.
o Deals exclusively with SONET paths and sections
o Based on measuring block errors
o BIS limits for OOS/ISM
o Evaluation periods of 15 minutes, 2 hours, 24 hours and 7 days
o First step is a continuity test for 15 minutes
Note:
Only one performance analysis can be performed at a time. To view or enable the M.2100 and M.2101 analyses, the
measurement timer has to be set to a determined period. The table below describes the anomalies evaluated for the performance
analysis selected.
7.6.3 General
The General setup page configures the audible alarm and APS protocol settings.
TX150 e-Manual D07-00-023 Rev A02
Page 30 of 107