background image

  Introduction

This manual provides instructions to install, setup, and operate the components of Veeder-Root Pressure 
Management Control (PMC) equipment. The PMC feature is an option for the TLS console platform, and as such, 
many of the installation/setup/operation instructions for non-PMC specific tasks are covered in TLS-3XX supplied 
literature. Do not use this manual when PMC is installed with ISD. Use the ISD Setup & Operation Manual, 
577021-800.

Site Requirements

Below are the requirements for all PMC installations:

• V-R TLS-350R/EMC w/BIR, TLS-350 Plus/EMC Enhanced, TLS-350/EMC and ProMax consoles with ECPU2 

- install as per TLS-3XX Site Prep manual, setup following instructions in TLS-3XX System Setup Manual.

• A flash memory board (NVMEM203) for PMC software storage - installed on the ECPU2 board in place of the 

console’s 1/2 Meg RAM board - install as per TLS-350 Series Board and Software Replacement Manual, no 
setup required.

• Smart Sensor Module and Vapor Pressure Sensor. Install and connect following instructions in the Vapor 

Pressure Sensor installation Guide.

• Mod Bus module connected to a hydrocarbon sensor module installed according to processor manufacturers 

specifications.

• An RS-232 Port will be available for use by contractor or government inspectors.

Contractor Certification Requirements

Veeder-Root requires the following minimum training certifications for contractors who will install and setup the 
equipment discussed in this manual:

Level 1

Contractors holding valid Level 1 Certification are approved to perform wiring and 
conduit routing, equipment mounting, probe and sensor installation, tank and line 
preparation, and line leak detector installation.

Level 2/3 or 4

Contractors holding valid Level 2, 3 or 4 Certifications are approved to perform 
installation checkout, startup, programming and operations training, troubleshooting 
and servicing for all Veeder-Root Tank Monitoring Systems, including Line Leak 
Detection and associated accessories.

ISD/PMC

This course of training includes In-Stations Diagnostics/Pressure Management Control 
(ISD/PMC) installation checkout, startup, programming, and operations training. It also 
includes troubleshooting and service techniques for the Veeder-Root In-Station 
Diagnostics system. A current level 2/3 or 4 certification is a prerequisite for the ISD/
PMC course. After successful completion of this course the contractor will receive a 
certificate as well as a Veeder-Root ISD/PMC contractor certification card.

Warranty Registrations

 

may only be submitted by selected Distributors.

Section 16

Pressure Management Control

16-1

Summary of Contents for TLS-350R

Page 1: ...Manual No 577013 801 Revision A Install Setup Operation Manual Pressure Management Control Section 16 Pressure Management Control 16 i...

Page 2: ...tailed description of the damage on the face of the freight bill The carrier s agent must verify the inspection and sign the description 2 Immediately notify the delivering carrier of damage or loss T...

Page 3: ...a period of one 1 year from the date of installation or twenty four 24 months from the date of invoice whichever occurs first During the first ninety 90 days we or our representative will repair or re...

Page 4: ...and Runtime Fault Alarm 19 Manual control 19 PMC Diagnostic Menu 19 Figures Figure 1 TLS console Interface Module Bays 3 Figure 2 Smart Sensor Setup 5 Figure 3 PMC Setup 6 Figure 4 TLS console alarm...

Page 5: ...Port will be available for use by contractor or government inspectors Contractor Certification Requirements Veeder Root requires the following minimum training certifications for contractors who will...

Page 6: ...is sup plied to the device A potential shock hazard exists TURN POWER OFF Live power to a device creates a potential shock hazard Turn Off power to the device and associ ated accessories when servicin...

Page 7: ...which interface modules can be installed Comm bay Power bay and Intrinsically Safe bay ref Figure 1 Probe Interface modules and Smart Sensor modules are installed in the Intrinsically Safe bay and the...

Page 8: ...em Grounding Probe and Sensor Shields Connect probe and sensor cable shields to ground at the console only Do not ground both ends of the shield CIRCUIT DIRECTORY A circuit directory is adhered to the...

Page 9: ...ECT SS CATEGORY UNKNOWN C C E S E S E S P F SMARTSENSOR SETUP PRESS STEP TO CONTINUE SETUP MODE PRESS FUNCTION TO CONT M P C C C F P S T Change E Enter Function Print M Mode Step Tank Sensor Key press...

Page 10: ...tes after start time Data collected 5 minutes before the Start of Test time is omitted from test S SET ANALYSIS TIME PRESS ENTER E S SET TEST START TIME TIME hh mm SET POST DELAY DURATION DELAY MINUTE...

Page 11: ...rm messages The system automatically prints an alarm report showing the alarm type its location and the date and time the alarm condition occurred Warning and alarm posting causes the TLS console base...

Page 12: ...ime the alarm was posted Alarm example in Figure 6 PMC Alarms are logged into the Priority Alarm History in the TLS Figure 6 TLS console alarm example MMM DD YYYY HH MM XM VP EMISSIONS WARN PMC ALARM...

Page 13: ...VST ASC Level C Warnonthefirst day Yellow VP EMISSIONS To notify when the mass emissions exceeds the defined threshold for the system Failonconsecutive days Red TLS 350PMCVariablesetup ConfirmationPr...

Page 14: ...YY HH MM SS XM ALL FUNCTIONS NORMAL S S S S EFFLUENT EMISSIONS TEST STATUS PASS S VP DUTY CYCLE TEST STATUS PASS pmc fig7 eps Prints out a copy of the PMC Status report See example at right C F P S T...

Page 15: ...S 232 board DB25 female Slots 1 2 or 3 ATEN USB to DB9 serial adapter P N 576040 170 Serial I O PC Card Plugs into PCMCIA port Multiport board DB9 female Slot 4 Laptop TLS 350R TLS 350R USB male lapto...

Page 16: ...tton you may see a repeat of the modem dialing windows in which case ignore cancel them all 4 When the Connect To window appears Figure 10 depending on your connection method select either COM1 If RS...

Page 17: ...disabled If the code was enabled you would see a 6 digit number which you will need to enter to access the console refer to the Sending Console Commands paragraph below for more information SETUP MOD...

Page 18: ...o the main screen If the RS 232 Security Code is disabled press and hold the Ctrl key while you press the A key then type in IV8200 If the RS 232 Security Code is enabled e g 000016 you must enter the...

Page 19: ...ocessor Status Report See example Figure 13 SOH IV8200 Vapor Processor Runtime Diagnostic Report See example Figure 14 SOH IV8000 Percent Hydrocarbon Diagnostic Report See example Figure 15 SOH IV8100...

Page 20: ...SSOR PMC MONITORING TEST PASS FAIL THRESHOLDS PERIOD BELOW ABOVE VAPOR PROCESSOR PRESSURE FAIL 90th PERCENTILE 1DAYS 1 00 INCHES H2O VAPOR PROCESSOR MASS EMISSION FAIL 1DAYS 0 64 LBS 1KG VAPOR PROCESS...

Page 21: ...5 NO 3 09 07 1 15PM 17 92 0 278 0 268 NO 3 10 07 3 01AM 7 70 0 200 0 223 NO 3 10 07 4 30AM 4 02 0 202 0 224 NO 3 10 07 7 54PM 23 62 0 306 0 245 NO 3 11 07 11 24PM 6 55 0 256 0 213 NO 3 12 07 11 31PM 2...

Page 22: ...M 1 042 8 25 07 7 57AM 1 040 8 25 07 7 57AM 1 040 8 25 07 7 57AM 1 032 8 25 07 7 57AM 1 030 8 25 07 7 56AM 1 050 8 25 07 7 56AM 1 040 8 25 07 7 56AM 1 040 8 25 07 7 56AM 1 032 8 25 07 7 55AM 1 050 8 2...

Page 23: ...anual Note If the PMD is on and the PMC mode is Automatic changing the control mode to Manual mode will turn the PMD off PMC Diagnostic Menu Figure 16 PMC Diagnostic Menus PMC VERSION 01 00 PRESS STEP...

Page 24: ...For technical support sales or other assistance please visit www veeder com Section 16 Pressure Management Control 16 20...

Reviews: