12
to ensure natural thermal convection. Please see Figure
2-1: Mounting.
CAUTION: If the controller is to be installed in an enclosed box,
it is important to ensure reliable heat dissipation through the box.
Step 2
:
Connect the system in the order of
❶
battery
❷
load
❸
PV array in accordance with Figure 2-
2,”Schematic Wiring Diagram” and disconnect the system
in the reverse order
❸❷❶
.
CAUTION:
While wiring the controller do not close the circuit
breaker or fuse and make sure that the leads of "+" and "-"
poles are connected correctly.
Figure 2-2 Schematic of wiring