8
F.
FILLING THE HEATER
Completely fill heater before turning on elements.
Water connections completed and free of leaks.
Check for proper installation of relief valve.
Close drain valve.
Open highest hot water faucet.
Open cold water inlet valve and fill system.
G.
WIRING
TANK MUST BE FULL OF WATER BEFORE POWER IS ON.
Separate fused branch circuit (refer to local codes).
Mark the electrical shut off for future reference.
Wiring diagram (see Table I)
Aluminum conductors (see wiring instructions).
Check to see that voltage on rating plate and supply agree.
CAUTION:
Unit must be properly grounded.
H.
INSTALLATION COMPLETED AND CHECKLIST FILLED OUT
BY____________________________________________________
DATE: ________________________________________________
SPECIAL NOTE:
Test of hot water after installation is necessary to be sure
temperature controls are working properly. (See water temperature regulation
information on page 8.)
Summary of Contents for Hydrastone ME Series
Page 14: ...13 INSTALLATION DIAGRAM PARTS LOCATION Figure I ...
Page 16: ...15 WIRING DIAGRAMS Table 1 ...
Page 19: ...18 NOTES ...