![Varta element 12 Operating Manual Download Page 56](http://html.mh-extra.com/html/varta/element-12/element-12_operating-manual_855372056.webp)
54
11.11.1
Battery module assembly
This section is directed towards the electrical specialist.
DANGER
Touching live parts!
Danger to life.
Comply with a waiting time of at least 3 minutes.
Ensure that the battery modules are switched off and that no LED display is lit
up.
The energy store must not be transported if a battery module is already
integrated.
Keep unauthorised persons away.
WARNING
Touching sharp-edged parts!
Cut injuries.
Wear your personal protective equipment
11.11.2
Opening the storage cabinet
The VARTA element backup is shut down using the on/off switch (3). Here, it should be taken into account,
however, that the replacement power connection is also supplied with voltage from the mains when switched
off. Thus, consumers connected to the replacement power connection are also supplied when the store is
switched off. If the replacement power connection is to be disconnected, the store must be switched off using
the on/off switch (3) and the network connection of the store switched off. (Racking out the store connection).
These two steps must be performed for work on the replacement power connection as well as for work on the
storage system.
1.
Actuate the on/off switch (3),
2.
Rack out fuse F1 (compare connection diagram).
Ensure that the on/off switch on the front of the housing is at “OFF” and the supply line to the store is
switched off.
To open the door, remove the three screws (4) on the left side of the cabinet.
Aid:
Torx 25 screwdriver
No.
Description
1
Cover
2
Type plate
3
On/off switch
4
Screws for opening the door
5
Black start button
6
Ventilation grid