14
10
10A
11
11A
11
11C
11B
10
Take out
the planetary
head in the following way:
a)
Take off the lid of the mixer
(2),
the operation panel
(3),
the attachment drive
(4),
the Poly V-belt
(6)
and the
planetary head pulley
(6D).
b)
Remove the top plate
(13A).
c)
Remove the screws
(10A)
and lift out the planetary head
d)
To mount the planetary head again follow the above instructions in reverse order.
note the torques declared for tightening screws
11
5A fuse
can be exchanged by pulling out the
small “drawer”
(11A)
at the top of the cable
plug
(11B)
. If the fuse is burned, it can be ex-
changed by the reserve fuse
(11C)
.
cable plug
(11B)
Screws to be
tightened with
a torque
10A - 8,8 Nm
13B - 18 Nm
13C - 9 Nm
13D - 9 Nm