![Vanguard 6500 PLUS Installation Manual Download Page 83](http://html1.mh-extra.com/html/vanguard/6500-plus/6500-plus_installation-manual_3412420083.webp)
Installation
2-75
Power-Up Verification
Power-Up
Diagnostics
In the event of major problems that affect the entire node, you can reboot a node to
initiate the power-up diagnostics. After the power-up diagnostics are complete,
check the Statistics screens to see the results
To initiate power-up diagnostics, press the RESET button on the 6500
PLUS
processor
card's front panel or issue a cold Node Boot from the control terminal.
Summary of Contents for 6500 PLUS
Page 1: ...Vanguard Managed Solutions Vanguard 6500PLUS Installation Manual...
Page 4: ......
Page 26: ......
Page 39: ...Installation 2 31 Installing Nodes in Modulus Enclosures...
Page 52: ...2 44 Installation Installing Nodes in Modulus Enclosures...
Page 98: ......