SECTION 3: INSTALLATION
090043-OP_r0 (MARCH -2015)
PAGE - 13
VANAIR MANUFACTURING, INC.
(800) 526-8817 • www.vanair.com
3.1 MACHINE PACKAGE
RECEIPT/INSPECTION
Upon receipt of the machine package,
inspect the exterior of the shipping crate for
signs of shipping/transit damage. Any
damage should be reported immediately to
the shipping company. Open the lid and
inspect the component parts and supports to
ensure that there has been no internal
movements of assemblies or components
which may have caused damage. Contact
Vanair Manufacturing, Inc. to report missing
items, incorrect part number, or other
discrepancies:
3.2 MACHINE PACKAGE
PREP
Vanair Manufacturing, Inc.
10896 West 300 North
Michigan City, IN 46360
Phone:
(219) 879-5100
(800) 526-8817
Service: (844)VANSERV
[844-826-7378]
Service Fax: (219) 879-5335
Parts Fax: (219) 879-5340
Sales Fax: (219) 879-5800
DANGER
Grounding must consist of a minimum 10
gauge wire between the instrument panel,
the machine, and the truck chassis.
DANGER
DO NOT install in enclosed spaces.
WARNING
ELECTRICAL HAZARD! Be sure the
battery is disconnected before starting
the installation.
NOTE
Install electrical components (circuit
breakers, pressure switches, toggle
switches, etc.) in locations where
exposure to water or moisture will be
most minimized.
NOTE
In order to prevent accidental damage to
vehicle components (fuel tanks, lines,
brake lines, wiring harnesses), note their
location before drilling any holes.
WARNING
Installation must adhere to the safety
precautions listed in the Safety Section of
this manual for cooling and noxious fume
ventilation.
If mounting footprint is tighter than the
recommended minimum requirements,
consult the Vanair Service Department for
application installation
recommendations.
NOTE
For guidance on machine start-up
procedure and control panel functions,
consult
Section 4, Operation
.