SECTION 5: MAINTENANCE
AIR N ARC
®
150 SERIES
PAGE - 30
090043-OP_r0
(MARCH - 2015)
VANAIR MANUFACTURING, INC.
(800) 526-8817 • www.vanair.com
5
.3 MAINTENANCE
S
CHE
DULE
T
ABLE
INTER
V
ALS
WARNING
Bef
o
re
p
e
rf
or
mi
ng
mai
n
te
nan
ce:
Sh
ut
do
wn
m
a
ch
in
e
, r
e
li
e
v
e
a
ll
s
ystem pres
sure and lock out
a
ll
po
wer
, as pe
r
th
e
S
a
fe
ty
Se
ct
io
n of
thi
s
manu
al
.
Al
w
a
ys
cl
earl
y
t
a
g the
st
art-up
instrument
ation.
BREAK-
IN
PERIOD
MAINTEN
ANCE SCHEDULE
Ho
u
rly
o
r
Cal
e
n
d
a
r Pe
ri
od
-
wh
ic
he
ver
co
mes first
NOTE
First 20
Hours of
Operation
After 8
Hours or
Daily
After 40
Hours or
Week
ly
Every 100
Hours or
One Year
Every 200
Hour
s
Afte
r 600
Hour
s
After 1000
Hour
s
If wo
rkin
g in du
sty or
d
irty
con
d
it
ion
s
,
redu
ce the
re
commende
d
time
inte
rva
ls
be
tw
ee
n
s
e
rv
ic
in
g
by
ha
lf
for e
n
gi
ne
a
n
d
c
o
mp
re
s
s
o
r oi
l
ch
an
ge
,
a
nd
en
g
in
e
and
com
p
re
sso
r filter se
rvicing
.
TASK
A
C
TION
TO
TAKE
1
Check tension
of compressor
p
o
ly-li
n
k d
rive
belt
•
•
••
•
•
T
igh
ten
b
e
lts i
f
ne
ce
ssary.
Con
s
ult
Se
ctio
n 5.5.3.3
.
2
C
hang
e eng
ine oi
l.
•
••
•
•
Co
nsult th
e oil chan
ge proce
dure in the Engi
ne
Owner’
s
Man
ual to ch
ang
e the
e
ngin
e
oil
.
3
W
a
sh
en
gine
a
ir p
re-clean
er
•
•
•
••
•
•
Re
mo
ve a
nd w
a
sh e
ngi
ne a
ir filter p
reclea
ner: Co
nsult
the Eng
ine Owner’s Manu
al fo
r
p
ro
c
edure
4
C
heck engi
ne oil
l
e
vel
•
•
••
•
•
Co
nsult e
ngin
e
o
il
level
check p
rocedu
re in
the
Engin
e
Owner’
s
Man
ual to ch
eck
the
e
ngin
e
oil le
vel.
5
C
heck and main
ta
in
co
mp
ressor oil l
e
vel at prop
er
a
m
ount
shown
in
the
sig
h
t
gl
a
s
s
•
•
••
•
•
Co
mp
ressor mu
st
ope
ra
te
a
t
oil
l
e
vels
within
the
pa
rameters
o
f the sigh
t gla
s
s.
Do
n
o
t ove
rfil
l or
o
perate at low leve
ls.
6
C
heck air ta
nk
for water
accumulation
•
•
••
•
•
Dra
in any water fro
m
all
a
ir
tan
k
s en
ti
re
ly on a dai
ly
basis.
7
Insp
ect un
it for oil le
aks
o
r
d
a
mage
•
•
••
•
•
Visu
ally
note a
n
y l
eaks o
r
evid
ence
of le
aks arou
nd
th
e
compre
sso
r u
n
it a
nd
hose
con
nection
s.
Ti
ghten
an
y
lo
ose conn
ecti
on poi
nt
wh
ere nee
ded
. Rep
a
ir or
rep
lace an
y da
ma
ged
p
a
rt.
8
Insp
ect cool
er fin
s
(bo
th
e
ngi
ne
and
comp
re
sso
r) for
co
ntaminatio
n)
•
•
••
•
•
Cl
ean or clea
r
as ne
ce
ssary.
Con
tin
ue
d
on
ne
x
t p
a
ge