
[
03
]
źŸ&KDQJH
0RYH
1VT
xx.x
VHF
G
xx.x
VHF
HT
xx
O
&
x.x
s
&7
xx
O
&
2SHUDWLRQ1R
9DFXXPSDWWHUQ E\WLPHUDQGVHWWLQJWLPH
*DVIOXVKLQJWLPH
+HDWLHDWLQJWLPH &RROLQJWHPS
[
03
]
źŸ&KDQJH
0RYH
1VT
xx.x
VHF
G
xx.x
VHF
HT
xx
O
F
x.x
s
&7
xx
O
F
2SHUDWLRQ1R
9DFXXPSDWWHUQ E\WLPHUDQGVHWWLQJWLPH
*DVIOXVKLQJWLPH
+HDWLHDWLQJWLPH &RROLQJWHPS
Display
1
2
3
6
5
4
7
8
10
9
Turn on the circuit breaker.
Open an air cock.
A pressure lever opens.
Turn on the power button.
Select the desired operation number.
Set heating temperature.
[Setting range: 60 ~ 250
°
C /140 ~ 480
°
F]
6HWJDVÀXVKLQJWLPH
[Setting range: 0.1 ~ 99.9 seconds]
Set vacuum time.
[Setting range: 0.1 ~ 99.9 seconds]
Set heating time.
[Setting range: 0.0 ~ 2.0 seconds]
Set cooling temperature.
[Setting range: 40
°
C/100
°
F ~ heating temp. set value]
Depress a foot switch (1st).
Operating Procedure
7 Preparation >>> 7-5 Turn ON the breaker
7 Preparation >>> 7-4 Set up an air source
7 Preparation >>> 7-6 Turn ON the power switch
Refer to “CONTROL UNIT FC16(6)R Operating Instructions”
>>> “4-2-2 Select a desired operation mode number.”
Operation mode = “03 1-GAS timer”
Refer to “CONTROL UNIT FC16(6)R Operating Instructions”
>>> “4-2-5 Set heating temperature.”
Refer to CONTROL UNIT FC16(6)R Operating Instructions”
>>> “4-2-14 Set gas timer for 1-time gas mode.”
Refer to CONTROL UNIT FC16(6)R Operating Instructions”
!!!³5HJLVWHUDWLPHJDVÀXVKLQJPRGH´!!!
Select the timer vacuuming mode”,
Refer to “CONTROL UNIT FC16(6)R Operating Instructions”
>>> “4-2-6 Set heating time.”
Refer to “CONTROL UNIT FC16(6)R Operating Instructions”
>>> “4-2-7 Set cooling temperature.”
A vacuum nozzle moves forward.
Reference Item or Description
LOS-NT/NTW series Operating Instructions Ver.6.02E
28
8-3 Operation No.[03] < [1 time] timer vacuuming, gas-flushing and sealing>
Summary of Contents for LOS NT Series
Page 43: ...LOS NT NTW series Operating Instructions Ver 6 02E 43...
Page 53: ...LOS NT NTW series Operating Instructions Ver 6 02E 53 16 2 LOS NTW series piping diagram...
Page 57: ...LOS NT NTW series Operating Instructions Ver 6 02E 57...
Page 63: ...LOS NT NTW series Operating Instructions Ver 6 02E 63...