53
Revision D November 2022
QuadGuard
®
HS Final Inspection Checklist
Date:
________________________
Inspector: ________________________
Location: _____________________________
Anchors are properly torqued (p. 13)
Unobstructed clearance of 30” behind rear Fender Panels (p. 18)
Transition Panel fits against the hazard (no gaps) (p. 23)
Every hole and slot in Backup and Monorail is anchored (p. 25)
Anchor stud(s) are no higher than 1.5” above the pad (p. 26 & 42)
If no transition, check for narrow side panels at Backup (p. 26)
Monorail guides bolts/nuts tightened to all Diaphragms (p. 27)
Fender Panel Mushroom Washer Nuts tightened to bolt shank (p. 30)
Mushroom Washers lay flat in slots (p. 30)
End Cap attached to front of Monorail (p. 32)
Cartridges are resting on Cartridge supports in each Bay (p. 33)
Fender Panel gap is
≤
3/4” [20 mm]
for Narrow systems (p. 35)
Correct Cartridge types for each Bay (p. 36 & 50)
Bolts and nuts are properly tightened (p. 35)
Fender Panel gap is
≤
1.00” [25 mm]
for Wide systems (p. 50)
Important:
It is critical that you inspect this product after assembly is
complete to ensure the instructions provided in this manual have been
strictly followed.