41
Revision D November 2022
Assembly Wide
1) Mark System
Location
Locate the centerline of the system by measuring the proper offset from the hazard. Refer
to the drawing package supplied with the system. Place chalk line to mark the centerline
of the system. Mark a construction line parallel to the center line and offset
6.5” [165 mm]
to one side as shown in Figure 49. The edge of the Monorail will be placed on this line.
Note:
The concrete pad should be placed per the project plans supplied with the system.
Caution:
Location of the QuadGuard
®
HS with respect to the hazard is critical
and dependent on the type of Transition Panel used. See the project plans
supplied with your system for details.
2) Anchor the Backup and Monorail
Refer to Figure 50 (Tension Strut Backup Assembly), Figure 51 (Monorail Assembly) and
the drawing package for more information.
A. For Tension Strut Backup Assembly (Figure 50)
Locate Tension Strut Backup and Monorail on foundation with side of Monorail on
the construction line (Figure 49). Verify that any applicable Transition Panels fit
properly before anchoring Backup. Drill anchor holes in foundation using the
Backup as template. Anchor the Backup to the foundation using the approved
adhesive kits provided (p. 13).
Warning:
Every borehole and slot in Backup and Monorail must be anchored
by a stud using an approved adhesive.
Figure 49
(Top view of Foundation)
Locating Construction Line
ADHESIVE KIT
3/4” X 7” STUD
TENSION STRUT BACKUP
Figure 50
Anchoring Tension Strut Backup to Foundation