26
Revision D November 2022
2) Anchor the Backup and Monorail
Refer to Figure 16 (showing concrete Backup Assembly) or Figure 17 (showing Tension
Strut Backup Assembly) and Figure 18 (showing Monorail assembly). See drawing
package.
A. For Concrete Backup Assembly (Figure 17)
Locate front face plate using the Backup Assembly drawing. Drill anchor holes in the
Concrete Backup using the face plate as a template. Anchor the face plate to the
Concrete backup using the approved anchoring system provided (p. 13).
B. For Tension Strut Backup Assembly (Figure 18)
Locate Tension Strut Backup and Monorail on pad with side of Monorail on the
construction line (Figure 16). Verify that any applicable Transition Panels fit properly
before anchoring Backup. Drill anchor holes in pad using the Backup as template.
Anchor the Backup to the concrete pad using an approved adhesive kit (p. 13).
Warning:
Every borehole and slot in Backup and Monorail must be anchored by
a stud using an approved adhesive.
Figure 16
Anchoring Backup Face Plate
to Concrete Backup
Figure 17
Anchoring Tension Strut Backup
to Foundation
ADHESIVE KIT
3/4” X 6 1/2” STUD
ADHESIVE KIT
3/4” X 7” STUD
BACKUP FACE PLATE
CONCRETE BACKUP
TENSION STRUT BACKUP