30
3. The underside of each ceramic rock is identi
fi
ed
by a number and a speci
fi
c protruding positioning
triangle.
Install the six rocks from left to right starting with
rock no. 1.
4. Place the left twig across the
second and third rocks from the
left
; rest its end on the edge of the
platform as shown.
Make sure to
leave a gap between the twig and
the fi rst rock to allow fl ame to come up between
the twig and the rock.
5. Place the right twig across the
second and third rocks from the
right
; rest its end near the edge of
the platform as shown.
Make sure to
leave a gap between the twig and
the fi rst rock to allow fl ame to come up between
the twig and the rock.
All Rocks
Installed
Rock
identi
fi
cation
Triangular
hole in
ceramic
base
Please note that the position of the rocks and
twigs (when used) is critical to insure proper
performance of the appliance.
Rocks Installation (1300IR)
INSTALLATION