INSTALLER’S GUIDE
Page 23
Figure 21. Lower Cable Retention
Figure 20. Floor Fixing
Figure 19. Cable Route
6.
Thread the cables through the eyebolts. Return the
cables through the holes near the bottom of the convection
box back panel,
(For precast or clay block flue systems
return the cables through the slotted holes in the side
of the convection box),
and through the “V” shaped
brackets near the bottom front sides of the convection box
- See figure 19.
7.
Place the convection box fully back into the fireplace
opening so that it is sealed against the fireplace front
surround.
8.
Drill a hole into the fireplace floor
through each of the two holes in the
base of the convection box using a
no.12 masonry drill. See figure 20.
9.
Insert a fibre plug into each hole.
Use the rawlplugs supplied with this
appliance -
Never use plastic plugs
instead of the fibre plugs supplied
.
Fit a woodscrew in each plug and
tighten.
Always screw the base into position
before applying tension to the cables.
This will ensure a tight seal between
the top of the convection box and wall
10.
Fit a cable retainer over the
bottom end of each cable.
11.
Pull each cable taut. Push the
cable retainers hard up against the “V”
brackets. Tighten the screws in the
retainers so that they clamp the cables in
position. Apply tension to the cables by
turning the hexagonal adjusters by hand.
See figure 21.