![Valor Heating BG C-1 Installer'S Manual Download Page 33](http://html2.mh-extra.com/html/valor-heating/bg-c-1/bg-c-1_installers-manual_3268471033.webp)
INSTALLER’S GUIDE
Page 33
Fig 52 Flow rate controller
8.
If fitting a new tap, remove the hexagonal nut at the mounting bracket end of the old
tap and fit to the replacement tap. Refit in the reverse order. When refitting, make sure
that the tap spindle is in the correct relationship relative to the control pivot bracket.
Rotate the pivot bracket fully clockwise. The tap spindle should “bottom out” (i.e. the tap
should be fully open) after the pivot bracket has actuated the ignition microswitch but
before it has pushed the microswitch leaf against the microswitch body.
When refitting the thermocouple and interrupter block, make sure that the microswitch
wires are properly secured to give a good electrical contact.
16.11
To Remove the Gas Flow Rate Controller
See figure 52.
1.
Remove the burner unit - See section 16.6.
2.
Detach the microswitch cover - See section 16.1 paragraph 2.
3.
Detach the shut-off tap as
detailed in section 16.11 paragraphs
2-6.
4.
Detach the burner pipe from the
controller. Support the controller
while detaching to prevent excessive
strain.
5.
Remove the nut and washer
securing the control pivot bracket to
the controller at the front. Support
the pivot bracket while removing the
nut to prevent possible damage to
the microswitch.
6.
Remove the hexagonal bolt
securing the control pivot bracket to
the controller at the rear.
7.
Detach the control pivot bracket.
8.
Remove the hexagonal nut
securing the controller to the front
mounting bracket and remove the flow rate controller.
9.
Refit in the reverse order.