![Valor Heating BG C-1 Installer'S Manual Download Page 23](http://html2.mh-extra.com/html/valor-heating/bg-c-1/bg-c-1_installers-manual_3268471023.webp)
INSTALLER’S GUIDE
Page 23
Fig. 31 Ceramic Base
Installation
Fig. 32 Front Coal Location
Fig. 33 Front Row of
Coals
3.
Align the hole near the bottom of the control linking bar with that in the control pivot
bracket. Join them with the knurled shouldered screw previously removed. Make sure
that the isolating valve is closed. Slide the control button fully from top to bottom and
back to make sure that the slide and pivot mechanisms move smoothly. Note that some
resistance should be felt when the slide button reaches the “burner fully on” position.
1 2 C E R A M I C C O A L S I N S T A L L A T I O N
1.
Place the ceramic base coal in the burner compartment. The bottom rear face of the
coal should rest on the angled ledge at the back of the burner compartment. The bottom
front recessed edge of the coal base should locate against the step in the burner plaques.
See figure 31.
(Installer - Note that the small round holes in the burner plaques which will be covered
by the base coal are not gas burner ports. They are simply a consequence of the plaque
manufacturing process).
2.
Place the ceramic front coal in position in front of the base coal. Make sure that the
side legs of the front coal are fully seated into the burner tray. There will be a gap
between the rear of the front coal and the front of the base coal. See figure 32.
3.
Install the 13 loose coals as follows. There are 2 “finger” coals, 7 medium size coals
and 4 large coals. Place all the loose coals so that they are firmly seated in the valleys in
the coal base and front coal.
4.
Place the 4 large coals in the valleys of the front coal. See figure 33.