NOTES
Name of the farm
Commissioning date
Serial number
i.p. adresse
CHECKLIST
Step 1:
Positioning the charging station
Step 2:
Installing the magnets
Step 2.1:
Triangle of reference
Step 2.2:
Installing the magnets (path in the farm)
Step 3:
Calibration of the motors
Step 4:
Connection the Pro-Feed to the wi-fi network
Step 5:
Connecting the charging station
Step 6:
Training at reference points
Step 6.1:
Training
Step 7:
Correction of the magnets positions
Step 8:
Creating a path
Step 9:
Let’s try it !
Step 10:
Creating rides
initial :
Step # :