![Valcourt FP11 FRONTENAC Installation And Operation Manual Download Page 49](http://html2.mh-extra.com/html/valcourt/fp11-frontenac/fp11-frontenac_installation-and-operation-manual_3204196049.webp)
49
1.4.7.2
Universal Offset Support
This support is used to support the chimney above an offset. When the chimney offset is used to
pass through a wall, this support may be used on the wall to support the chimney. For offset
support installation, refer to the instructions provided with the support by the chimney
manufacturer. Many manufacturers will provide the maximum height of chimney that can be
supported by the support. Make sure you respect those parameters.
1.4.8
Chimney Chase and Multiple Terminations
For the purpose of this manual, a chimney chase is considered a part of the chimney system
rather than part of a building. The termination must be placed a minimum of 18" (460 mm) above
the chase.
For installations where more than one chimney is located in the same chase or within the same
area, we suggest that their terminations be separated by at least 16" (410 mm) horizontally, and
18" (460 mm) vertically. This separation is to prevent smoke migrating from one chimney to
another (see
Figure 34
).
18"
457.21mm
18"
457.2mm
16"
406.4mm
16"
406.4mm
18"
457.2mm
Figure 34
1.4.9
Installation Instructions for Masonry Application
WARNING: BEFORE STARTING THE INSTALLATION, THE MASONRY CHIMNEY
MUST BE INSPECTED BY A QUALIFIED CHIMNEY SWEEPER.
Summary of Contents for FP11 FRONTENAC
Page 12: ...12 Figure 5...
Page 13: ...13 Figure 6...
Page 15: ...15 Figure 7 Figure 8...
Page 16: ...16 Figure 9 Figure 10...
Page 17: ...17 Figure 11...
Page 18: ...18 Figure 12...
Page 19: ...19 Figure 13...
Page 20: ...20 Figure 14 Chase construction Spacers must be installed...
Page 22: ...22 Facing with the Narrow Overlap Figure 15...
Page 23: ...23 Facing with the Masonry Trim Figure 16...
Page 26: ...26 Figure 19...
Page 30: ...30 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7...
Page 32: ...32 Step 3 Step 4 Step 5 Step 6...
Page 33: ...33 Step 7...
Page 41: ...41 Figure 27a Figure 27b...
Page 44: ...44 EXAMPLE OF TYPICAL CHIMNEY INSTALLATION Figure 30...
Page 46: ...46 Figure 31...
Page 47: ...47 Figure 32...