1.
Once the fireplace is fully installed, press the masonry trim (A) against the fireplace (the
longest side towards the bottom going inside the fireplace).
2.
Secure the masonry trim (A) to the fireplace with 4 screws (B) supplied with the
fireplace. Always make sure the masonry trim is squared to the fireplace.
3.
Make sure that the doors still slide perfectly.
4.
Once the trim is installed, you may proceed with the installation of the non combustible
wall (all types of cement board). See section 1.3.4.2.
5.
Install the non combustible material on top of the cement board and against the exceeding
side of the masonry trim (A).
Figure 25
Masonry Trim
Summary of Contents for FP11 FRONTENAC
Page 12: ...12 Figure 5...
Page 13: ...13 Figure 6...
Page 15: ...15 Figure 7 Figure 8...
Page 16: ...16 Figure 9 Figure 10...
Page 17: ...17 Figure 11...
Page 18: ...18 Figure 12...
Page 19: ...19 Figure 13...
Page 20: ...20 Figure 14 Chase construction Spacers must be installed...
Page 22: ...22 Facing with the Narrow Overlap Figure 15...
Page 23: ...23 Facing with the Masonry Trim Figure 16...
Page 26: ...26 Figure 19...
Page 30: ...30 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7...
Page 32: ...32 Step 3 Step 4 Step 5 Step 6...
Page 33: ...33 Step 7...
Page 41: ...41 Figure 27a Figure 27b...
Page 44: ...44 EXAMPLE OF TYPICAL CHIMNEY INSTALLATION Figure 30...
Page 46: ...46 Figure 31...
Page 47: ...47 Figure 32...