MC122 - MCP-4J Control Unit
Section 6 - Maintenance
85
Section 6 - Maintenance
This section contains maintenance procedures for the Valco MCP-4J Control. A regular maintenance program helps
ensure longer life and efficient operation of your system. A few minutes spent on maintenance greatly reduces
downtime.
Purging the Adhesive
The system should be purged of air at every startup or shift change. To purge the system, follow these steps:
1. Install the applicator head onto the contact glue valve.
2. Purge adhesive until no air is present and the glue flows evenly.
The glue valves can be purged manually using an activator
located on the valve itself, by a solenoid-operated air valve,
or they can be purged using the touchscreen panel and
control.
When using any valve in the top-down position for the first
time, it might be necessary to remove the valve and hold it
so that the applicator head is at the top. The fluid pressure
should then be set to 4 bar, and the solenoid should be fired
until all the air is out and a flow of glue is present.
Performing Downtime Maintenance
The type of downtime maintenance that is necessary for the MCP-4J Control Unit depends on the length of time the
unit is down.
During short periods of downtime, such as order changeover, follow these steps:
1. Apply lithium grease or petroleum jelly to the orifice of the applicator head (contact extrusion valve) to
prevent dried adhesive from clogging the valve.
2. Wipe the valve clean before restarting production.
For longer periods of downtime, follow these steps:
1. Remove the applicator head from the contact glue valve.
2. Install a stopper onto the contact glue valve in place of the applicator head.
3. Flush the applicator head with clean water.
If the system is idle for 30 days or longer, follow these steps:
1. Flush the entire glue supply system (including the pump or tank) with clean water (see Flushing the Glue
System in this section).
Summary of Contents for MCP-4J
Page 4: ......
Page 10: ...Table of Contents MC122 MCP 4J Control Unit 6 ...
Page 12: ...Section 1 Introduction MC122 MCP 4J Control Unit 2 ...
Page 20: ...Section 2 Safety and Use MC122 MCP 4J Control Unit 10 ...
Page 38: ...Section 3 Basic features MC122 MCP 4J Control Unit 28 Wiring the Scanner Cable Continued ...
Page 59: ...MC122 MCP 4J Control Unit Section 4 Programming 49 Protected Level Mode Continued ...
Page 100: ...Section 6 Maintenance MC122 MCP 4J Control Unit 90 ...
Page 102: ...Section 7 Specifications MC122 MCP 4J Control Unit 92 ...
Page 130: ...Section 8 Part Number List MC122 MCP 4J Control Unit 120 ...
Page 132: ...Section 9 Warranty MC122 MCP 4J Control Unit 122 ...
Page 134: ...Section 10 Service MC122 MCP 4J Control Unit 124 ...
Page 136: ...Appendix A Job Charts MC122 MCP 4J Control Unit 126 Job Number Job Name Description ...
Page 146: ...Appendix C Instruction Sheets for the MCP 4J MC122 MCP 4J Control Unit 136 ...
Page 156: ...MCP 4J Quick Start Guide IS0368 Valco Melton 10 Operator Panel ...