![Vaisala CAB100 Installation Manual Download Page 108](http://html2.mh-extra.com/html/vaisala/cab100/cab100_installation-manual_3171839108.webp)
15. Reconnect power in
CAB100B
:
a. Reconnect the power wires in the power block located on the right-hand side of the
cabinet.
b. Switch on the circuit breaker.
c. Switch on mains power.
For instructions on configuring measurement units and scaling in DL4000 data loggers,
see
Vaisala viewLinc Enterprise Server Version 5.0 User Guide
(M211975EN).
More information
‣
CAB100 Installation Guide
M212242EN-B
106
Summary of Contents for CAB100
Page 1: ...M212242EN B Installation Guide CMS Industrial Cabinet CAB100...
Page 144: ......
Page 146: ...www vaisala com...