18
VAIO Operating and installation instructions
Carefully lift the element towards the stove
so that the screw heads fit through the key-
holes. Then carefully slide the side section
downwards.
Mount the right side section in the same
way as the left one.
Four silicone points (2 spare points are
provided in the scope of delivery), have
already been attached to the top of the side
sections in the factory. They are used to
support the top plate.
Make sure that all four screw
heads slide into the keyholes at
the same time.
Make sure that the sealing strips
on the undersides of both side
sections are supported on the
heating technology floor plate.
10
11
12
Mounting the left side section
Mounting the right side section
Information about the silicone points
Note: - If the side section wobbles after being mounted or there is a gap, mount it again and screw the coun-
tersunk head screws further in.
- If the side section is too heavy or cannot be lowered down into the keyholes, mount it again and slightly
unscrew the countersunk head screws.
keyholes.