
14
VAIO Operating and installation instructions
6. Detailed installation instructions
When unpacking the goods, make sure that your cutting tools (blades, cutting knives, scissors, etc.) do not
cause any damage.
Heating technology
Door handle including top inlay (natural stone/wood) and front inlay (wood)
Side parts (natural stone)
Top plate (natural stone)
4 adjustable feet
Oven glove
A4 cover with: - fastening material
- other accessories
- guarantee certificate
- stone certificate
- operating and installation instructions
-> fastening material: - 8 countersunk head screws (for the side cladding)
- 2 countersunk head screws (for the door handle)
- 5 wood screws (for the top/front inlay made of wood)
-> other accessories: - 2 silicone points (for the top plate)
Unpacking the goods
Lieferumfang
Transporting the components to the site of installation
When transporting the goods, make sure that your hands/gloves are clean.
Never place the ceramic elements near sharp edges or corners.
Never push or pull the ceramic elements along the floor or ground (risk of scratching).
Always carry the ceramic elements to the site of installation, never use carts etc. to transport them.
The heating technology should only be transported in the upright position or slightly tilted on its back; ne-
ver pick it up from the door side.
If using luggage carts as a transport aid, only ever pick up the heating technology from the back, never
from the door side.
Only transport the heating technology with the fire compartment door closed.