6.3 Operating the Boiler

Ensure the boiler mains switch is turned on.

Ensure that the programmer and thermostats are
calling for heat.

Check that the boiler fires and heats the cylinder
contents and the radiators according to the DHW and
room thermostat settings.

Carry out the commissioning and testing procedures
detailed in the installation instructions supplied with
the boiler.

Upon completion of the commissioning procedures,
set the DHW thermostat knob on the uniSTOR to
approx. 60 °C, and set the back up immersion heater
(fig. 9) thermostat to 60 °C.

6.3.1 Benchmark Cylinder Commissioning

Checklist

Complete the Benchmark Cylinder Commissioning
Checklist included in the instructions.

6.4 User’s Instructions

Hand these instructions for use to the user for retention
and instruct in the safe operation of the boiler and
cylinder. Advise the user of the operation of the cylinder
thermostat and the immersion heater thermostat, and
that normally a setting of max, which gives a stored
water temperature of approximately 60 °C is adequate.

Note:
In hard water areas the DHW temperature
setting should not exceed this setting to avoid
possible scale build-up.

Advise the user of the precautions necessary to prevent
damage to the system and to the building if the system
does not remain operative during frost conditions.

Advise the user that the immersion heater is provided
as a back up means of water heating and is not intended
for use at the same time that the boiler is heating the
cylinder.

Finally, advise the user that for continued efficient and
safe operation, the boiler and uniSTOR cylinder should
be serviced at least once a year by a qualified servicing
company. It is important and strongly recommended
that arrangements are made for a maintenance
agreement with a qualified servicing company to ensure
regular servicing of the boiler and cylinder.

Please contact Group Service
(0870 - 6060777) for further details.

Note:
Leave installation, servicing and user
instructions with the user.

7 Maintenance

The following maintenance work has to be carried out
annually by the competent installer or Vaillant Service
Solutions.

Inspection of pressure/temperature relief valve and
expansion relief valve.
Manually operate each valve by twisting the operating
cap, and check if water flows unobstructed via the
tundish to the discharge point. Ensure that both valves
re-seat satisfactorily.

Check pressure of expansion vessel.
Turn off mains water supply and open nearest hot
water tap to depressurise the secondary water system.
Check the expansion vessel charge with a pressure
gauge at the test point. If the pressure is below
3.0 bar, top up with suitable air pressure pump.

Complete service section of Cylinder Commissioning
Checklist.

Note:
In the event that parts require replacement, use
only genuine spare parts supplied by Vaillant
Ltd.

0020005468_02_GB_042008.qxd  16.04.2008  14:17 Uhr  Seite 21

Summary of Contents for uniSTOR VIH GB SERIES

Page 1: ...Instructions for Installation and Use uniSTOR Unvented hot water storage cylinder VIH GB 125 S VIH GB 155 S VIH GB 180 S VIH GB 210 S VIH GB 260 S VIH GB 310 S GB...

Page 2: ...y System 8 4 2 Secondary Return 8 5 Installation 9 5 1 Installation requirements 9 5 1 1 Siting 9 5 1 2 Mains Water Pressure 9 5 1 3 Pipework Primary Circuit 9 5 1 4 Discharge Pipework 9 5 1 4 1 High...

Page 3: ...ting is controlled by a separatly fitted 2 port valve in conjunction with suitable external controls such as a programmer room thermostat or thermostatic radiator valves 1 3 Immersion Heater uniSTOR c...

Page 4: ...28 30 33 39 44 49 kg Weight full 145 175 205 245 310 340 kg Height 969 1179 1339 1499 1789 2109 mm Cylinder connections Cold mains inlet 22 mm compression DHW outlet 22 mm compression Balanced pressu...

Page 5: ...ate cylinder heat up time 15 C to 65 C minutes Reheat time for 70 of cylinder contents minutes 50 40 10 20 30 40 60 50 30 20 12 Heat input to cylinder kW Cylinder Heat Up Times 15 20 25 30 38 35 VIH G...

Page 6: ...d be completed by the installer and or commissioning engineer and handed to the user All CORGI registered installers carry a CORGI ID card and have a registration number Both should be recorded in you...

Page 7: ...y will become invalid if the damage is due to frost or freezing transient voltages lightning strikes or any act of vandalism or misuse 2 The proof of purchase must be produced in the event of any warr...

Page 8: ...aws of the local Water Undertaking The installation is subject to Building Regulation approval notify the Local Authority of intention to install In the event of parts replacement use only genuine spa...

Page 9: ...uniSTOR unvented storage cylinder should not be installed Contact Vaillant Ltd for details on alternative hot water supply systems In order to minimise frictional losses minimum 22 mm bore is recomme...

Page 10: ...g temperature relief valve 500 mm maximum 300 mm minimum providing that where children may play or otherwise come into contact with discharges a wire cage or similar guard is positioned to prevent co...

Page 11: ...84 314 589 903 VIH GB 180 S 1308 1339 454 384 314 589 1038 VIH GB 210 S 1468 1499 454 384 314 589 1118 VIH GB 260 S 1758 1789 454 384 314 589 1408 1376 VIH GB 310 S 2078 2109 454 384 314 589 1648 1376...

Page 12: ...niSTOR GB 12 1 Boiler 2 uniSTOR cylinder 3 2 port motorised valve provided with the boiler 4 Immersion heater 5 2 port motorised valve A Boiler flow B Boiler return Fig 5 1 A B 2 4 3 5 M M DHW 5 3 Fun...

Page 13: ...f valve 2 Expansion relief valve 3 Pressure limiting valve combined with strainer 4 Connection to expansion vessel 5 Balanced pressure cold water outlet 6 Cold water mains inlet 7 DHW outlet 8 Tundish...

Page 14: ...ns supply to the uniSTOR To ensure optimum performance from the uniSTOR and particularly in installations where the balanced pressure cold water outlet 5 fig 8 is to be used the pipework provided from...

Page 15: ...pe runs are of excessive length or there are several terminal fittings supplied extend the length of pipework in 22 mm Connect the secondary return if required as shown in 4 2 Secondary Return 5 4 3 S...

Page 16: ...ls 1 Thermostat adjustable b Immersion heater 2 Thermal cut out with Reset button 3 Sensor 2 1 2 a b 1 3 230 V AC 3 kW 1 2 3 N L Important The immersion heater incorporates an energy cut off device an...

Page 17: ...for electrical installations IEE Wiring Regulations 16th edition Check that the sensors from the immersion heater and the cylinder are positioned correctly in the tubes Note A special accessory is off...

Page 18: ...Note Earth not required Link L 2 5 Siemens Landis Staefa RWB2 RWB9 Potterton Myson EP 2002 EP 3002 EP 6002 Note Link L 5 Sunvic Select 207 N L 2 3 4 5 3 7 6 1 E N L 2 3 4 1 E N L 2 3 4 5 3 7 6 1 N 3 5...

Page 19: ...4 5 6 7 8 9 10 SL 1 2 3 uniSTOR VIH GB Central Heating 2 Port Motorised Valve Hot Water 2 Port Motorised Valve Cylinder Stat E BL BR GR OR L N Pump E BL BR GR OR L N HW ON CH ON 2 Channel Programmer...

Page 20: ...cylinder has reached temperature and all radiators in the system are hot Then once again drain the complete CH system to remove residues from the pipework and refill and vent again as above Reset the...

Page 21: ...ring frost conditions Advise the user that the immersion heater is provided as a back up means of water heating and is not intended for use at the same time that the boiler is heating the cylinder Fin...

Page 22: ...g to controls instructions Is 2 port valve in correct position DHW position Does cylinder thermostat operate Replace cylinder thermostat Vent heating coil of air H fig 4 Check replace 2 port valve Is...

Page 23: ...ansion vessel Does pressure hold Turn off boiler and immersion heater Is discharge still occuring YES NOT OK Is the discharge occuring only when the cylinder is being heated YES NO Is pressure downstr...

Page 24: ...ty YES Replace TPRV Replace immersion heater NO YES NO Is operation now OK OK Fault remedied NOT OK Check temperature control of boiler Does 2 port valve change to heating position when cylinder reach...

Page 25: ...limiting valve OK Check pressure limiting valve OK Check sytem for blockage OK Symptoms still persisting YES Check system as for discharge from temperature or expansion relief valve Inform customer t...

Page 26: ......

Page 27: ......

Page 28: ...0020005468_02 GB 042008 Subject to alteration Printed in Germany...

Reviews: