25
BOILER INSTALLATION SEQUENCE
Caution
Mains connection terminals L
and N remain live even when
the boiler on/off control is
switched off.
●
Refit the terminal box cover by
pushing into place until it clips
back into position.
●
Raise the control panel and secure
in place.
Connection to the main
supply
●
Lower the control panel.
●
Unclip the terminal box cover (
1
)
from the control panel (
2
).
●
Feed the power supply cord in to
the appliance as shown (fig I.9).
●
Use cable clamps.
●
Connect the power supply cord as
follows (Fig. I.11, on page 26).
Green/yellow (earth) wire
boiler terminal Earth sign
Blue (neutral) wire
boiler terminal N
Brown (live) wire
boiler terminal L
Note: DO NOT
use boiler terminal
connections 7-8-9.
Summary of Contents for TURBOmax Pro 2 E
Page 31: ...31 COMMISSIONING PART I...
Page 32: ...32 COMMISSIONING PART I 2 5 3 4 Fig Com 1 Draining the heating system Eor B S 207 0GB_Pro...
Page 65: ...65 FAULT FINDING...
Page 71: ...71...