38
FUNCTIONAL CHECKS
(COMMISSIONING PART III)
I
0
Functional checks
Procedure
Once the unit has been installed and
the gas supply has been checked,
operate the system to ensure that it is
working correctly.
●
Operate the system, following the
operating instructions supplied with
the boiler.
●
Check the system for water leaks
and escaping gas.
●
Check that the flue has been
correctly installed, according to the
fitting instructions supplied with the
flue assembly.
●
Check the burner for correct
ignition and flame picture.
●
Check the hot water system for
correct operation.
●
Check the heating system for
correct operation.
Fig. F.1: Test for correct functioning
Euro B/S 058/0