3
I
0
2
I
0
90
°
90
°
1
Euro B/S 041/1
Fig. I.5: Remove of boiler casing
20
BOILER INSTALLATION SEQUENCE
Removing boiler casing
●
Turn both securing fasteners (
1
)
anti-clockwise by 90° to release
control panel.
●
Lower control panel (
2
).
●
Pull the case (
3
) forward at the
bottom to disengage from the
securing clips.
●
Lift the case slightly to clear the top
locations and pull forward to
remove.
Summary of Contents for TURBOmax Pro 2 E
Page 31: ...31 COMMISSIONING PART I...
Page 32: ...32 COMMISSIONING PART I 2 5 3 4 Fig Com 1 Draining the heating system Eor B S 207 0GB_Pro...
Page 65: ...65 FAULT FINDING...
Page 71: ...71...