Installation
14
ecoTEC plus installation and maintenance instructions 0020134823_01
4
Positioning the unit for final installation –
restricted installation
>
If the unit weighs more than 25 kg, it should always be
transported by two persons, where possible.
>
Fix the unit bracket securely to the wall before lifting the
unit and placing it in position.
>
If required, provide the work surface with sufficient pro-
tection against damage.
>
Ensure that you hold the unit securely at the front and
side and lift it - if available - onto the work surface.
>
Hold the unit in a balanced position and then lift it fur-
ther upwards and position it on the bracket.
>
If the unit is being positioned on the bracket by two per-
sons, ensure that you have a firm grip on the front and
side/bottom of the boiler.
>
Ensure your movements are coordinated if the unit is
being lifted by 2 persons, so that its weight is evenly dis-
tributed.
>
Use safe lifting techniques – keep your back straight –
and bend your legs at the knee –if you are lifting some-
thing from the floor.
>
Do not twist your body – instead, reposition your feet.
>
During the entire lifting process, hold the boiler as close
as possible to your body to minimise the strain on your
back.
>
If required, get somebody to assist you in this.
>
Wear appropriate cut-resistant and non-slip gloves to
protect yourself against sharp edges and maintain a safe
and secure grip while handling the unit.
Positioning the unit for final installation – with
restricted installation position under the roof.
>
If the unit weighs more than 25 kg, it should always be
transported by two persons, where possible.
>
Ensure that you hold onto the front and side of the unit
securely, lift it, hold it in a balanced position and then lift
it further upwards and position it on the bracket.
>
If the unit is being positioned on the bracket by two per-
sons, ensure that you have a firm grip on the front and
side/bottom of the boiler.
>
Ensure your movements are coordinated if the unit is
being lifted by 2 persons, so that its weight is evenly dis-
tributed.
>
If the unit is being positioned on the bracket by one per-
son, ensure that you have a firm grip and lift the boiler
from the bottom.
>
Use safe lifting techniques – keep your back straight –
and bend your legs at the knee –if you are lifting some-
thing from the floor.
>
Do not twist your body – instead, reposition your feet.
>
During the entire lifting process, hold the boiler as close
as possible to your body to minimise the strain on your
back.
>
If required, get somebody to assist you in this.
>
Wear appropriate cut-resistant and non-slip gloves to
protect yourself against sharp edges and maintain a safe
and secure grip while handling the unit.
>
Before setting up the unit, it is recommended that you
perform a risk assessment of the attic storey, in order to
check the access, floor rigidity, lighting, and railing, and
to take all required remedial actions before the unit is
installed.
Summary of Contents for ECOTEC PLUS VU 80
Page 70: ......
Page 71: ......
Page 74: ......
Page 75: ......
Page 76: ...0020134823_01 GBIE 122012 Subject to change Manufacturer Supplier...