background image

Instructions for Use, Installation and Servicing ecoMAX pro

7

IMPORTANT NOTICE:

The boiler is supplied in one pack and the flue is  

supplied separately.

The boiler is factory set for use on Natural Gas (G20). 

The ecoMAX pro 28E, only, can be field adjusted for use 

on LPG (propane G31).

Where no British Standards exists, materials and  

equipment should be fit for their purpose and of suitable 

quality and workmanship.

Refer to Manual Handling Operations, 1992 regulations.

The installation of this boiler must be carried out by a 

competent person in accordance the rules in force in the 

countries of destination.

Manufacturer’s instructions must not be taken as  

overriding statutory requirements.

4.1 Sheet Metal Parts

 Caution!

 

 When installing the appliance, care should be 

taken to avoid any possibility of personal injury 

when handling sheet metal parts.

4.2 Statutory Requirements

The appliance is suitable only for installation in GB and 

IE and should be installed in accordance with the rules in 

force. In GB the installation of the boiler must be carried 

out by a competent person as described in the following 

regulations:

The manufacturer’s instructions supplied.

The Gas Safety (Installation and Use) Regulations.

The appropriate Buildings Regulations either The 

Building Regulations, The Building Regulations 

(Scotland),The Building Regulations (Northern Ireland).

The Water Fittings Regulations or Water bye laws in 

Scotland. The Health and Safety at Work Act, Control of 

Substances Hazardous to Health (COSHH).

The Current I.E.E. Wiring Regulations.

Where no specific instructions are given, reference 

should be made to the relevant British Standard Code of 

Practice. In IE, the installation must be carried out by a 

competent person and installed in accordance with the 

current edition of I.S.813 “Domestic Gas Installations”, 

the current Building Regulations and reference should be 

made to the current ETCI rules for Electrical Installation.

In GB the following Codes of Practice apply:

BS4814, BS6798, BS5440 Part 1 and 2, BS5546 Part 1,

BS5449, BS6891, BS6700, BS7074 Part 1 and 2, 

BS7593, BS7671.

In IE: I.S.813, BS5546, BS 5449, BS 7074, BS 7593.

Manufacturer’s instructions must not be taken as 

overriding statutory requirements.

Note: For further information, see the current issue of the

Building Regulations, approved document L1 ( in the UK) 

and the current issue of the following:

1) Central heating system specification (CheSS)

2) Controls for domestic central heating system and hot 

water. BRECSU.

Certification

This boiler certificated to the current issue of EN 483 for

performance and safety.

It is important that no alteration is made to the boiler, 

without permission, in writing, from Vaillant.

Any alteration that is not approved by Vaillant, could 

invalidate the warranty and could also infringe the 

current issue of the Statutory Requirements.

4.3 Gas Supply

The gas installation must be in accordance with the  

current issue of BS6891. In IE this is the current edition 

of IS813.

The supply from the governed meter must be of  

adequate size to provide a steady inlet working pressure 

of 20mbar (8in wg) G20 and at the boiler.

On completion, test the gas installation for soundness 

using the pressure drop method and suitable leak  

detection fluid, purge in accordance with the above  

standard.

4.4 Technical Data

All dimensions are given in millimetres (except as noted). 

See Fig. 4.1.

The data label is positioned on the combustion chamber 

cover see fig. 4.2. 

The data label includes the product Gas Council number;

18E - 41 044 30

28E - 41 044 31

The Seasonal Efficiency Domestic Boilers UK (SEDBUK) 

is:

All ecoMAX pro: Class ‘A’.

The value is used in the UK Government’s Standard 

Assessment Procedure (SAP) for energy rating of 

dwellings. The test data from which it has been 

calculated has been certified by B.S.I.

General information 4

Summary of Contents for ecoMAX pro 18E

Page 1: ...To be left with the user Instructions for Use Installation and Servicing ecoMAX pro Wall hung condensing boilers for traditional open vented systems GB 18 E 28 E...

Page 2: ...System unvented 13 6 9 Sealed water Systems 13 6 9 1 Safety Valve 14 6 9 2 Expansion Vessel 14 6 9 3 Pressure Gauge 14 6 9 4 Domestic Hot Water Cylinder 14 6 9 5 Water Make up 14 6 9 6 Filling a Seale...

Page 3: ...u will find a Benchmark gas boiler commissioning checklist It is very important that this is completed correctly at the time of installation commissioning and hand over to the user List of Content 1 I...

Page 4: ...rk on this appliance shows compliance with 1 Directive 90 396 EEC on the approximation of the laws of the Member States relating to appliances burning gaseous fuels 2 Directive 73 23 EEC on the harmon...

Page 5: ...e to operate at all Important information 2 2 13 Condensate Drain The condensate drain see section 10 3 must not be modified or blocked 2 14 Pluming from flue terminal All condensing boilers produce a...

Page 6: ...y The bar symbol is also shown and this indicates the modulating output of the boiler The boiler will automatically modulate to the output needed by the heating system the more bars that are displayed...

Page 7: ...s Installations the current Building Regulations and reference should be made to the current ETCI rules for Electrical Installation In GB the following Codes of Practice apply BS4814 BS6798 BS5440 Par...

Page 8: ...y G20 Gross CV s t 37 8 37 8 MJ m3 Maximum gas rate 2 00 3 02 M3 h Minimum gas rate 0 53 0 56 M3 h Burner CO2 Case on 9 0 0 2 9 0 0 2 Gas connection 15 mm Compression 15 mm Compression Water connectio...

Page 9: ...Instructions for Use Installation and Servicing ecoMAX pro 9 Fig 4 1 12729 12740 Fig 4 2 General information 4...

Page 10: ...fused 3 pin plug both to the current issue of BS 1363 may be used provided they are not used in a room containing a bath or shower The colours of three core flexible cable are blue neutral brown live...

Page 11: ...at least the minimum operational and servicing clearances are provided see fig 5 1 Additional clearances may be beneficial around the boiler for installation and servicing For flue installations where...

Page 12: ...le duty pump should be set to give a temperature difference of no greater than 20 C between the flow and return with the thermostat set at MAX which is about 80 C to give a flow rate as shown in table...

Page 13: ...tinel GE Betz Widnes Cheshire WA8 8UD Tel 0151 420 9595 6 6 Open Vented Water System The boiler must be supplied from an unrestricted water supply taken from a feed and expansion cistern situated at a...

Page 14: ...tem It shall be preset non adjustable with a lift pressure of 3 bar incorporating seating of a resilient material a test device and a connection for drain The safety valve discharge pipe must be route...

Page 15: ...lant appliances are certified only for use with genuine Vaillant flue pipes Only use genuine Vaillant flue pipes Malfunctions can occur if you use other accessories These may result in damage and inju...

Page 16: ...a fanned flue terminal should be positioned as follows a at least 2m from an opening in a building directly opposite and b so that the products of combustion are not directly directed to discharge acr...

Page 17: ...tional bends etc are detailed in the flue installation instructions Fig 8 1 13467 Installation preparation 8 Boiler fixing 9 Boiler fixing 9 1 Fitting the boiler hanging bracket If previously removed...

Page 18: ...a Preferably the drain pipe should run and terminate internally to the house soil and vent stack at least 450mm above the invert of the stack A trap giving a water seal of at least 75mm should be inco...

Page 19: ...current issue of BS1363 Do not interrupt the mains supply with a time switch or programmer Caution This appliance must be wired in accordance with these instructions Any fault arising from incorrect...

Page 20: ...water to the initial design pressure 12 3 Gas supply Isolate the boiler from the mains electrical supply The complete gas installation including the gas meter must be isolated tested for soundness and...

Page 21: ...e stabilisation time the boiler will ramp slowly to full rate rather than going immediately to full rate this feature is designed to cope with small system requirements 12 5 Testing Gas The boiler is...

Page 22: ...is recommended that it is checked and serviced at regular intervals The frequency of servicing will depend upon the installation conditions and usage but in general once a year should be adequate Draw...

Page 23: ...13 4 fully clockwise Turn the throttle back anti clockwise 5 1 2 turns Ensure that the gas analyser is set to the correct fuel setting Propane To obtain conversion follow the procedure as below Conne...

Page 24: ...2 with the B offset adjustment using a 2 mm allen key to 10 5 rotate clockwise to increase After checking the combustion press and hold the mode button for 10 seconds to return to the normal mode show...

Page 25: ...he flames are evenly covering the surface of the burner Inspect for signs of excessive flame lift or sooting 14 1 General To ensure the continued safe and efficient operation of the boiler it is recom...

Page 26: ...ce schedule in column 2 x 6 Remove the burner module as described in section 8 1 6 if maintenance schedule is required from steps 2 3 or 5 above Clean the primary heat exchanger Fit new burner door se...

Page 27: ...he reverse order to removal With the appliance operational carry out the following functional checks 1 Check the combustion preferably with a flue gas analyser see section 15 If a flue gas analyser is...

Page 28: ...t see fig 14 2 Remove the chassis front by pulling it out at the top from its retaining slots Note When replacing chassis front panel ensure the bottom fits behind lip Disconnect the gas valve electri...

Page 29: ...y to disengage the clip jaws from each other Remove flexible tubes from adapter Lift off the adapter Remove the drain connection downstream of the condense trap Remove the two condense trap securing s...

Page 30: ...e correct design pressure If the pressure is lower than this the vessel should be re pressurised using an air pump Refit the valve cap Re pressurise boiler and heating system Re commissioning the boil...

Page 31: ...turn up any room thermostats to call for demand With the boiler interface in normal operating mode press and hold the mode button for 10 seconds until a flashing 0 appears Press the key and scroll th...

Page 32: ...is on and a supply of 230V is present at the boiler terminal strip 3 Check that the gas supply to the boiler is on that it has been correctly purged and that an inlet pressure of 20mbar is available a...

Page 33: ...th NTC No function however if altered to 1 ON fault adjustable code 8 will be displayed tank NTC fault 10 Adaptive heating or night day switch No function adjustable 11 Night day setpoint Delta value...

Page 34: ...mer This would cause no pump overrun F16 Flame detection fault flame presence 5 s after burner stop Gas valve defective F17 Power supply 170 V Check electrical supply polarity Check fan F18 Local user...

Page 35: ...Instructions for Use Installation and Servicing ecoMAX pro 35 Fault finding wiring diagram 16 Fig 16 3 16 4 Fault Finding 12933...

Page 36: ...0260 Fan assembly 2 090750 Spark electrode 3 091258 Igniter unit 4 053574 Gas control valve 5 101771 Heating flow return NTC 2 6 101191 Overheat stat 7 130837 Main PCB 8 256271 Mains Reset Switch 9 13...

Page 37: ...Instructions for Use Installation and Servicing ecoMAX pro 37 Declaration of Conformity 17...

Page 38: ...Instructions for Use Installation and Servicing ecoMAX pro 38...

Page 39: ...Instructions for Use Installation and Servicing ecoMAX pro 39...

Page 40: ...0020005557_04 GB 08 2006 Subject to alteration...

Reviews: