page 12 of 70
+
Do not use the pump to generate pressure.
+
The pumps are designed for
ambient temperatures
during operation b50°F and +104°F (+10°C
and +40°C). Periodically check maximum tempera-
tures if installing the pump in a cabinet or a housing.
Make sure ventilation is adequate to maintain recom-
mended operating temperature. Install an external au-
tomatic ventilation system if necessary. If pumping hot
process gases, make sure that the maximum permitted
gas inlet temperature is not exceeded. The maximum
permitted gas inlet temperature depends on several
parameters like inlet pressure and ambient tempera-
ture (see “Technical data”, pg. 23”).
+
Particles and dust must not enter the pump.
+
Do not pump liquids.
• Ensure that the pump is chemically resistant to the
pumped substances prior to operation.
Use the equipment
only as intended
, that is, for genera-
tion of vacuum in vessels designed for that purpose. Any
other use will automatically invalidate all warranty and li-
ability claims. Remain aware of safety and risks.
Setting up and installing the equipment
➨
Equipment must be connected only to a
suitable elec-
trical supply
and a suitable ground point. As such,
the plug must be plugged into an outlet that is properly
grounded. Failure to connect the motor to ground may
result in deadly electrical shock.
The supply cable may be fitted with a molded Europe-
an IEC plug or a plug suitable for your local electrical
supply. The cable contains wires color coded as fol-
lows: green or green and yellow: ground; blue or white:
neutral; brown or black: hot.
NOTICE
Summary of Contents for ME 16 NT
Page 42: ...page 42 of 70 3 4 5 4 4x 4 4x 4 2x...
Page 43: ...page 43 of 70 Don t loosen this screw 7 8 6 5 2x...
Page 44: ...page 44 of 70 9 10 11 5 2x...
Page 46: ...page 46 of 70 12 2 5 mm 13 14 2 5 mm 5 8x...
Page 47: ...page 47 of 70 15 696819 696827 16 17 Clean...
Page 48: ...page 48 of 70 696819 696827 18 19...
Page 50: ...page 50 of 70 Assembling the pump head 23 24 25 Pay attention to number of washers...
Page 52: ...page 52 of 70 29 30 31...
Page 54: ...page 54 of 70 35 Maintain all pump heads in the same way ME 16 NT MD 12 NT MV 10 NT 36A 36B...
Page 56: ...page 56 of 70 4 5 6 696827...
Page 57: ...page 57 of 70 7 8 size 2 2x 9 size 2 2x...
Page 59: ...page 59 of 70 Assembling the pump housing 37 38 39 5 2x 8 9 ft lbf 12 Nm...
Page 60: ...page 60 of 70 40 42 41 5 2x 8 9 ft lbf 12 Nm...
Page 61: ...page 61 of 70 45 4 2x 3 7 ft lbf 5 Nm 44 4 4x 3 7 ft lbf 5 Nm 43...
Page 62: ...page 62 of 70 46 4 4x 3 7 ft lbf 5 Nm 47 4 4x 3 7 ft lbf 5 Nm 48...