vacon • 3
24-hour s358 (0)201 212 575 • Email: [email protected]
AT LEAST THE FOLLOWING STEPS OF THE
MUST BE PERFORMED
DURING THE INSTALLATION AND COMMISSIONING.
IF ANY PROBLEMS OCCUR, PLEASE CONTACT YOUR LOCAL DISTRIBUTOR.
Start-up Quick Guide
1.
Check that the delivery corresponds to your order, see Chapter 3.
2.
Before taking any commissioning actions read carefully the safety instructions in
Chapter 1.
3.
Before the mechanical installation, check the minimum clearances around the unit
(Chapter 5.6) and check the ambient conditions in Chapter 4.2.
4.
Check the size of the motor cable, mains cable, mains fuses and check the cable
connections, read Chapters 6.2.2 to 6.2.7.
5.
Follow the installation instructions, see Chapter 7.
6.
Control connections are explained in Chapter 8.2.1.
7.
If the Start-Up wizard is active, select the language of the keypad, the application you
want to use and set the basic parameters asked by the wizard. Always confirm by
pressing the
. If the Start-Up wizard is not active, follow the instructions 7a
and 7b.
7a. Select the language of the keypad from the Menu M6, page 6.1. Instructions on using the
keypad are given in Chapter 9.
7b. Select the application you want to use from the Menu M6, page 6.2. Instructions on using
the keypad are given in Chapter 9.
8.
All parameters have factory default values. In order to ensure proper operation, check
the rating plate data for the values below and the corresponding parameters of
parameter group G2.1.
• nominal voltage of the motor
• nominal frequency of the motor
• nominal speed of the motor
• nominal current of the motor
• motor cos
ϕ
Some options may require special parameter settings.
All parameters are explained in the All in One Application Manual.
9.
Follow the commissioning instructions, see Chapter 10.
10. The Vacon NX_ Frequency Converter is now ready for use.
Vacon Plc is not responsible for the use of the frequency converters against the
instructions.