E
N
G
L
IS
H
37
3.2 - INSTALLATION MEASURES
To carry out a proper installation of the operator parts as well as to ensure the best automation performance, the measurement
levels shown in the following table shall be complied with. Change the gate structure to adapt it to one of the cases in the table, if
necessary.
1.
Depending on the opening angle of the leaves or panels, make sure it is possible to respect the dimensions reported in the table
2.
Measure the value of
B
on-site
3.
Based on the value for dimension
B
and the opening angle of the leaves or panels, the value of
A
may be deduced from the table
m
PLEASE NOTE: ensure there are no obstacles near the motor that might interfere with the arm, both during movement
and with the gate open.
B
A
C
D
90°
0 ÷ 60
120
450
615
60 ÷ 150
130
480
590
150 ÷ 180
140
500
570
180 ÷ 210
150
500
550
210 ÷ 230
160
500
530
230 ÷ 250
170
500
510
B
A
C
D
110°
0 ÷ 20
210
610
545
20 ÷ 30
220
620
525
30 ÷ 40
230
630
510
50 ÷ 60
240
630
500
60 ÷ 70
250
630
485
70 ÷ 80
260
650
475
80 ÷ 90
270
660
465
90 ÷ 110
280
660
450
B
A
C
D
100°
0 ÷ 50
170
540
590
50 ÷ 100
180
560
550
100 ÷ 130
180
570
545
130 ÷ 150
180
580
540
150 ÷ 170
190
580
520
170 ÷ 200
200
580
500
Summary of Contents for ZARISS Series
Page 2: ......
Page 34: ...ITALIANO 32 ...
Page 66: ...ENGLISH 64 ...
Page 98: ...FRANÇAIS 96 ...
Page 130: ...ESPAÑOL 128 ...
Page 131: ......
Page 132: ......