![Utopia Roseberry Installation Manual Download Page 10](http://html1.mh-extra.com/html/utopia/roseberry/roseberry_installation-manual_1065584010.webp)
Installation Guide
Roseberry Full Height Toilet Unit
Important Information
•
Read the instructions carefully.
•
Check the product for any signs of damage and remove any protective film.
•
It is recommended that a technically competent installer undertakes installation.
•
It is the
installer’s responsibility to carry out a thorough assessment of the wall type and the
weight of the cabinet and use appropriate fixings.
•
Care should be taken when drilling walls to avoid any hidden wires or pipes.
Installation
To fit a concealed cistern into the WC unit, pull the front top
fascia away from the cabinet with equal force on each side.
The lower front panel can now be lifted upwards away from
the cabinet. Secure the cistern in position according to the
instructions supplied with it.
To secure the WC unit against the wall, drill through the rear
top rail. Fix the unit in position using suitable fixings.
To cut the lower front panel to accommodate the toilet soil
pipe and cistern flush pipe, use a jigsaw with a fine-toothed
blade suitable for timber. Ensure that the room is well
ventilated when cutting the material.
All cut edges must be sealed with paint, PVA glue or good-quality
sanitary grade silicone sealant to prevent the ingression of moisture.
Re-fit the top fascia panel last, after plumbing connections
have been made and installation completed.
Care & Maintenance
Furniture should be regularly dusted with a soft cotton or micro-fibre cloth. For more thorough
cleaning, occasionally wipe your furniture with a soft cloth dampened with a mild detergent
solution. Surfaces should be thoroughly dried with a lint free cloth to prevent watermarks. Under
no circumstances should solvent cleaning agents, bleach or abrasive cleaning agents or cloths be
used. Glass or mirrored panels should be cleaned using a non-solvent based glass cleaner and a
soft cloth. Spills should be removed immediately using a clean cloth. All bathroom furniture will
deteriorate through prolonged periods of exposure to high levels of condensation so bathrooms
must be adequately ventilated using suitable extraction. Failure to ensure adequate ventilation
may invalidate your guarantee. If it required to use the touch-up paint, ensure that the surface is
dry and clean and free from dust or oils. The paint should be applied using a slightly damp
sponge. Carefully dap the paint onto the required area and leave it to dry. Multiple coats may be
required to build-up the paint to give the required finish.