© 2010 Utilicor Technologies Inc.
1
Table of Contents
minicor-2
™
at a Glance
2
Introduction
4
Suggested Operator Qualification and Training
6
6
Pre-Trip Procedure
7
7
Pre-Departure Checklist
8
Utilicor Process Pilot Bit and Integral Center Pilot Hole
9
10
11
Tips for a Successful Coring Operation
11
Step 1: Operating Instructions for Utilicor Rotary Cutter
13
Step 2: Coring Process
14
Step 3: Site Clean Up
17
Step 4: Detach Minicor-2
18
Tips for Successful Core Reinstatement
19
Core Reinstatement Procedure with Utilibond™
21
Core Reinstatement Equipment
24
Cold Weather Procedures
25
minicor-2
™
Equipment Maintenance
28
Drill Carriage Schematic
30
Pillow Block Assembly
31
Troubleshooting
32
minicor-2
™
Hydraulic Schematic
33
minicor-2
™
Electrical Schematic
34
Warranty
35
Utilibond™ MSDS
36
Utilibond™ WHIMIS.
40
Utilibond™ OSHA
41