![Utilicor Minicor 2 Operation Manual Download Page 21](http://html.mh-extra.com/html/utilicor/minicor-2/minicor-2_operation-manual_1065297021.webp)
© 2010 Utilicor Technologies Inc.
20
(10)
The core should now be seated slightly above the roadway.
CAREFULLY tamp down evenly on the surface of the core until it is
level with the road surface
. TAKE YOUR TIME. This is the most critical
step of the reinstatement process. DO NOT put too much pressure on
the core or you may wind up pushing it below the level of the road. If
you do this properly, the excess Utilibond™ will be gently forced out
through the kerf and pilot hole where it can be removed with a trowel
and disposed of. The core should be perfectly level with the road.
(11)
When finishing the reinstatement, keep the paved surfaces around the
drying Utilibond™ "wet" and final clean up of the original paved
surfaces will be easier.
(12)
If you are reinstating a core on a hill or incline, be patient while
finishing the bond. As the Utilibond™ sets, you will be able to feather it
as it gains workability, which will result in a flat and level core
reinstatement.
IMPORTANT: Always read and follow the instructions on the Utilibond™
pail.