Contents
MC450 Coring Unit. Operator’s Manual
© 2020 Utilicor Technologies Inc.
Section 1 - Overview
Warnings
1
Specifications
2
Attachment
lnstallation
and
Removal
3
Hydraulic
Hose
Connection
5
12
Volt
Power
Connection
6
Leveling
the
MTC
7
Testing
the
Hydraulic
Hook-up 8
Recommended
Core
Drum
Speeds
8
Section 2 - Coring
Step
1.
Attachment
Drive
Controls
9
Step
2.
Lock
Down
Latch
10
Step
3.
Coolant
Water
11
Step
4.
Begin
to
Cut
12
Notes
14
Parts and System
Unit
Components
15
Core
Drum
Assembly
17
Pillow
Block
Assembly 18
DryLin
Rails
and
Cars
19
Schematics
Hydraulic
Schematic
20
Electrical
Schematic
21
Pre
Trip
Check
List
22
Utilicor Process - Central Pilot Bit
23
Winterizing
24
Tips for Successful Coring Operation
25
Troubleshooting
26
Parts
and
Consumables
27
Warranty
30
Warranty registration card - Remove and Complete