27
FIGURE 6-4 Side Wall Concentric Terminal
1"(2.54cm)
Maximum
Combustion Air
Vent
1" (25.4mm) Max.
FIGURE 6-5 Side Wall Concentric Terminal Multiple
Appliances
Maintain 12"
clearance above
highest anticipated
snow level or grade
* See Note
Below
Vent
Combustion
Air
1" (25mm) Max.
Roof
Overhang
36"(914mm) Min.
Maintain 12"(30cm) US
(18"(46cm) Canada)
Clearance Above
Highest Anticipated
Snow Level Or Grade
12" (305mm) Min.
24" (610mm) minimum Horizontal distance between end bells
of each concentric terminal to prevent flue gas recirculation.
FIGURE 6-6 Concentric Terminal Connection
Note: Securing strap must
be field installed to prevent
movement of termination kit
in side wall
Vent
Combustion Air
1"(25.4mm)
Maximum
**See
Note
*2 (51mm), 3" (76mm) or
4" (102mm) Diameter
Intake/combustion air
Combustion Air
*2" (51mm) Diameter = 41" Length (1.1m)
3" (76mm) Diameter = 47" Length (1.2m)
4" (102mm) diameter = 36" Length (0.9m)
** Overall length may be modified by cutting or extending both
combustion air and vent pipes. 12" (305mm) is minimum allowable
length and 60" (1.2m) is maximum allowable length for this
dimension.
SDR-26 PVC (D2241) only may be used for extending pipes. Do not
use Schedule 40 PVC or use couplings to extend pipes. Dimension
will change if intake/vent pipes are lengthened or shortened.
OD 3
½
" (89mm) - *2" (51mm) kit
OD 4
½"
(114mm)
- 3" (76mm) kit
4" (102mm) kit
* 2" (51mm) For use with models 050/075/100
3" (77mm) For use with models 075/100/150/200/299
4" (101mm) For use with model 299
6 - COMBUSTION AIR AND VENT PIPING
Note
Note
Vent
PN 240011320 Rev. G 10/01/2021]