![USR IOT USR-N510 User Manual Download Page 8](http://html.mh-extra.com/html/usr-iot/usr-n510/usr-n510_user-manual_1064582008.webp)
User Manual
Your TrustWorthy Industrial IoT Partner
www.pusr.com
7
2.
Get started
Since the USR-N5X0 Series is connected through a TCP/IP network, you may need to know some basic facts about networking in
order to connect the server correctly.
Specifications and dimensions are not provided in this manual since they may differ considerably based on the hardware purchase.
Please refer to datasheet of each model for more information.
2.1.
Installation
You can choose whether to plug in the other peripheral ports at this point or do it later depending on the actual location of the device
or level of comfort for performing such operation.
2.1.1.
Wall mounting
The wall mounting option provides better shock and vibration resistance than the DIN-Rail vertical mount.
Locate the installation site and place the device against the wall. Use the wall mount plates as a guide to mark the locations of
the screw holes.
Drill two holes over the two marked locations on the wall. Insert the wall sinks into the walls.
Insert the screws into the wall sinks. Leave a 2 mm gap between the wall and the screw head to allow for wall mount plate
insertion.
Align the wall mount plate over the screws on the wall. Hang the device on two screws and slide it downward to lock in place,
then tighten the screw to enhance stability, see the following Fig.1.
Fig. 1
Wall mount installation
For device disassembling please power off the device and unscrew the screw on the wall about 2mm. Lift the device upward
slightly, take out the device,
2.1.2. DIN-Rail mounting
DIN-Rail mount kits must be purchased separately. They are not provided with the N5X0.
If you have purchased the DIN-Rail mount kit, proceed to place the screws on the back of the device as show in Fig.2.