Page 16
WEIGH HOPPERS & SURGE HOPPERS
WEIGH HOPPER SET
-
UP
NOTICE
USC highly recommends that the weigh hopper be set
-
up inside a
building or other covered structure to protect the machine from
weathering and wind.
The following steps outline the initial set
-
up of your USC
weigh hopper :
1.
Clear the area of bystanders, especially small
children, before moving.
2.
Be sure there is enough clearance from overhead
obstructions and power lines or other equipment to
move the machine into its working position.
3.
The hopper and scale frame will arrive bolted
together. (Drawing A
-
1)
4.
Separate the scale frame from the hopper assembly.
(Drawing A
-
2).
5.
Assemble the load cells (according to manual shipped
with load cells) and floor mount pads (B1) using 1/2
-
13 X 2 1/2” grade 5 bolts with a lock washer and nut.
(Drawing A
-
4) Note: arrow on load cell must point
down as shown in Drawing A
-
3.
Drawing A-1
Drawing A-2
Item #
Part #
Rev
Title
Qty
1
03-19-0107
A
LDCL 5000LB X4 KIT
1
2
05-03-1954
A
WDMT LDCL SUPP RL
4
3*
05-08-0865
A
SHIM KIT WEIGH HOPPER LDCL RL
1
4
06-01-0027
A
BOLT .500-13 X 2.00 ZP GR5
16
5
06-01-0028
A
BOLT .500-13 X 2.50 ZP GR5
16
6
06-01-0179
A
BOLT,.500-13 CONC ANCHOR ZP 5.5 LONG
8
7
06-02-0004
A
NUT FULL .500-13 ZP GR5
32
8
06-04-0004
A
WSHR LOCK SPLT .500 ZP
32
DETAIL A
DETAIL A
4
1
6
8
7
5
8
7
2
Drawing A-3
Item #
Part #
Rev
Title
Qty
1
03-19-0107
A
LDCL 5000LB X4 KIT
1
2
05-03-1954
A
WDMT LDCL SUPP RL
4
3*
05-08-0865
A
SHIM KIT WEIGH HOPPER LDCL RL
1
4
06-01-0027
A
BOLT .500-13 X 2.00 ZP GR5
16
5
06-01-0028
A
BOLT .500-13 X 2.50 ZP GR5
16
6
06-01-0179
A
BOLT,.500-13 CONC ANCHOR ZP 5.5 LONG
8
7
06-02-0004
A
NUT FULL .500-13 ZP GR5
32
8
06-04-0004
A
WSHR LOCK SPLT .500 ZP
32
DETAIL A
DETAIL A
4
1
6
8
7
5
8
7
2
Drawing A-4