Page 17
WEIGH HOPPERS & SURGE HOPPERS
DRW-WH80
6.
Attach the assembled load cells to the bottom of the scale frame (B2) using 1/2
-
13
X 2.0” grade 5 bolts with a lock washer and nut. (Drawing A
-
4). Orient load cells as
shown in drawing A
-
5.
DRAWING A-5
LOAD CELL